Project Title | Fort Thomas Treatment Plant Basin Improvements Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Fort Thomas, KY (Campbell County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The proposed Work is generally described as follows: demolish existing mixer in Rapid Mix No. 2 and install new mixer; demolish existing horizontal flocculators and associated concrete columns and redwood baffles in Basins 1 install new bridges/walkways in Basins 1 demolish existing clarifier mechanisms and drives in Basins 1 remove, refurbish, and re-install existing clarifier bridges/walkways in Basins 1 demolish existing tube settlers in Basins 1,2 3 and 4 and install new inclined plate settlers; demolish existing 8-inch sludge valves and electric actuators in Basins 1 complete concrete repairs in Basins 1 demolish and replace existing sodium hypochlorite metering pump discharge piping; remove and replace damaged floor coating under sodium hypochlorite metering pump discharge pipe rack; and complete associated electrical, mechanical, and structural work, together with all related work as specified and shown on the Drawings. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |