Similar Projects
Chapel Hill Connector - Perche Creek Trail - 00745 - 1949 - City of Columbia
Infrastructure
Conception
$500,000 CJ est. value
Columbia, MO 65203

Extend Hinkson Creek Substation Feeders - E0193 - 1837 - City of Columbia
Infrastructure
Conception
$10,000,000 CJ est. value
Columbia, MO 65203

5th Street & Life Science Center Tunnels Water Main Replacement
Infrastructure
Design
$29,626,148 est. value
Columbia, MO

General Site East Campus Utility Improvements
Infrastructure
Design
Columbia, MO

Oakland Gravel Road Sidewalk Project
Infrastructure
Bidding
$376,507 CJ est. value
Columbia, MO 65202

Ashland Water Line & Street Improvement
Renovation
Bidding
$800,000 CJ est. value
Ashland, MO 65010

Water Valves, Sleeves and Couplings - Multi Year
Term Contract
Post-Bid
Columbia, MO

Replace Water Mains in 5th Street and Life Science Center Tunnels
Infrastructure
Post-Bid
$375,000 to $416,700 est. value
Columbia, MO

Rough Site Grading, Parking and Storm Water System Installation
Infrastructure
Results
Columbia, MO

Replace Water Mains at Allton and Green Buildings
Infrastructure
Results
$91,500 to $100,500 est. value
Columbia, MO

O'Reilly Auto Parts (CO5) #6643 / Columbia
New Construction, Infrastructure - 6,972 SF
Construction
$1,300,000 CJ est. value
Columbia, MO 65202

RFQ Design - Professional Architectural and Engineering Design Consulting Services
New Construction, Infrastructure
Pending Verification
$67,000,000 CJ est. value
Columbia, MO 65203

Providence South Plaza
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Columbia, MO 65201

Brushwood Lake Road Loop Closure - E0185 - 1602 - City of Columbia
Infrastructure
Conception
$750,000 CJ est. value
Columbia, MO 65203

Park Shelter for More's Lake at the City of Columbia Municipal Power Plant
Infrastructure
Design
$100,000 CJ est. value
Columbia, MO 65201

Last Updated 05/03/2023 10:06 AM
Project Title

Replace Utility Lines East of Memorial Student Union

Physical Address View project details and contacts
City, State (County) Columbia, MO 65201   (Boone County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,418,048 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For General Site - Replace Utility Lines East of Memorial Student Union CONSTRUCTION ESTIMATE: $1,280,000 - $1,418,048 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions regarding the scope of work should be directed to Joel Vogt with RTM at (618) 920-7686 or joel.vogt@rtmec.com. Questions regarding commercial conditions should be directed to Jennifer Sullivan at (573) 882-8376 or sullivanjl@missouri.edu. Information regarding bid results will be available the day following the bid opening by calling (573) 882-1133 A Diversity Participation goal of 10% MBE, 10% Combined WBE, DBE, Veteran Owned Business and 3% SDVE has been established for this contract. The Owner reserves the right to waive informalities in bids and to reject any and all bids. Individuals with special needs as addressed by the Americans with Disabilities Act may contact (573) 882- 1133.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents