Similar Projects
IH 41 - IH 43 Const / Resurf Mill / Overlay
Infrastructure
Conception
$15,000,000 CJ est. value
Ashwaubenon, WI 54304

IH 41 - IH 43 Const / Resurf Mill / Overlay
Infrastructure
Conception
$15,000,000 CJ est. value
Ashwaubenon, WI 54304

2022 Sidewalk & Parking Lot Improvements
Infrastructure
Design
$805,551 CJ est. value
Ashwaubenon, WI 54304

2022 Sidewalk & Parking Lot Improvements
Infrastructure
Design
$805,551 CJ est. value
Ashwaubenon, WI 54304

2022 Fourth Avenue Utility and Street Reconstruction
Infrastructure
Bidding
$685,000 CJ est. value
Pulaski, WI 54162

2022 Fourth Avenue Utility and Street Reconstruction
Infrastructure
Bidding
$685,000 CJ est. value
Pulaski, WI 54162

Experience Greater Green Bay Visitor Center
New Construction, Infrastructure - 12,566 SF
Sub-Bidding
$6,500,000 CJ est. value
Green Bay, WI 54304

Culvert Replacement and Hot Oil Chip Sealing
Post-Bid
WI

Chambers Hill Farm 1st Addition Roadway
Post-Bid
Suamico, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Sewer and Water Relay and Street Resurfacing
Results
De Pere, WI

Total Service Development Building Addition
Addition, New Construction, Infrastructure - 2,450 SF
Pending Verification
$525,000 CJ est. value
Howard, WI 54303

Total Service Development Building Addition
Addition, New Construction, Infrastructure - 2,450 SF
Pending Verification
$525,000 CJ est. value
Howard, WI 54303

Shawano - Green Bay Constr Ops / Misc Fencing
Infrastructure
Design
$2,000,000 CJ est. value
Green Bay, WI 54301

Culvert Replacement and Road Repair
Infrastructure
Bidding
$150,000 CJ est. value
Green Bay, WI 54301

Last Updated 08/19/2022 08:05 AM
Project Title

Midway Road Improvements

Physical Address View project details and contacts
City, State (County) Rockland, WI 54115   (Brown County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT SHALL CONSIST OF: o Proper signage and traffic control; o Control of site erosion and sediments; o Milling of existing pavement of Midway Road and intersections; o Grading and re-compaction of millings; o Placement of 4-inch asphalt not over approximately 275,000 square feet; and o Topsoiling, seeding, fertilizing, and mulching. Contract documents are subject to the provisions of Sections 62.15, 66.0901, 66.0903, and 779.15, Wis. Stats. The bid proposal shall be accompanied by a Certified Check or Bid Bond in the amount of not less than five (5) percent nor more than ten (10) percent of the maximum bid, payable to the Town of Rockland, as a guarantee that the bidder, if the bid is accepted, will execute and file the Contract. The Certified Check is returnable to the bidder immediately after the signing of the Contract. A performance bond in the amount of 100 percent of the total bid price, and a Certificate of Insurance along with an executed contract will be required of the successful bidder. The Town requires that all Bidders assume an affirmative duty to notify the Town of errors in the plans and specifications. The Town reserves the right to reject any or all bids, waive informalities in the bidding, or to accept the Bid or Bids which best serve the Town. No bid shall be withdrawn for a period of 60 days after the opening of Bids without consent of the Town

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents