Similar Projects
Valve Assessment Program
Post-Bid
Elmhurst, IL

2021 GM Roads Program
Post-Bid
West Chicago, IL

2021 MFT Street Maintenance Program
Results
Hinsdale, IL

Sidewalk
New Construction
Results
Less than $261,687 est. value
IL

HMA Surface Removal
Post-Bid
Wood Dale, IL

2021 Paving
Results
Clarendon Hills, IL

Utility and Roadway Improvements Project 20001 Phase 1
Post-Bid
Glen Ellyn, IL

Co-Op Park Site Improvements
Results
Glen Ellyn, IL 60137

2021 Sidewalk and Concrete Street Repair Program
Post-Bid
Glen Ellyn, IL

Sunnyside Road, Pierce Avenue, Bryn Mawr Avenue and Sycamore Avenue Water Improvement
Results
Roselle, IL

Oak Brook Sports Core Improvements
Post-Bid
Less than $450,000 est. value
Oak Brook, IL

2021 Street Resurfacing ST-004(B)
Results
Downers Grove, IL

2021 Naperville Heights Water Main Replacement
Post-Bid
Naperville, IL

2021 Sidewalk and Curb Maintenance Program
Results
Naperville, IL

Village Hall Parking Lot Expansion and Lisle-Woodridge Fire Station #52 Parking Lot Rehabilitation
Post-Bid
Woodridge, IL

Last Updated 09/21/2022 07:04 AM
Project Title

Traffic Signal Modernization and Intersection Improvements of IL 59 at Joliet St/Edgewood Walk and at James Ave

Physical Address View project details and contacts
City, State (County) West Chicago, IL 60185   (DuPage County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

(4.18-Mile) Traffic signal modernization and intersection improvements of IL 59 at Joliet St/Edgewood Walk and at James Ave, pavement removal, HMA resurfacing, curb and gutter removal and replacement, median removal, traffic signal removal and replacement, adjustment of drainage structures, and pavement markings. Located in the City of West Chicago and Winfield Township. Region 1 District 1 Federal Project # HSIPSRHP(922) County(s) DuPage Key Route(s) FAP 338 Marked Route(s) IL 59 Section(s) 2021-087-TS&N State Job #(s) C-91-203-21 PPS #(s) 1-79740-0000 Completion Date : 65 Working Days Questions not accepted as of September 13, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, September 02, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 017 - Traffic Signal Modernization and Intersection Improvements of IL59 at Joliet Street/Edgewood Walk and at James Avenue

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents