Similar Projects
Broadstone Retail Development
New Construction, Infrastructure
Conception
$4,000,000 CJ est. value
Sanford, FL 32771

State Road 426 Resurface - Florida Department of Transportation
Infrastructure
Conception
$6,900,000 CJ est. value
Oviedo, FL 32765

Heritage Park
New Construction, Infrastructure - 44,300 SF
Design
$55,000,000 CJ est. value
Sanford, FL 32771

Dwell at Lake Mary
New Construction, Infrastructure - 19,000 SF
Design
$107,600,000 CJ est. value
Lake Mary, FL 32746

Debary Tower Foundation Modification
Infrastructure
Bidding
$375,000 CJ est. value
Sanford, FL 32771

Georgetown Storm Sewer Upgrades
Infrastructure
Bidding
$400,000 CJ est. value
Sanford, FL 32771

Charisma Media Office Building
New Construction, Infrastructure - 20,775 SF
Sub-Bidding
$1,500,000 CJ est. value
Sanford, FL 32771

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Seminole County Fire Station No. 39
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Sanford, FL 32771

Backflow Testing and Repair Services
Results
FL

Fire Hydrant Maintenance, Repair and Replacement Services
Results
Sanford, FL

Chipotle - Phase 1 - Sitework
Demolition, Infrastructure, Alteration
Construction
Casselberry, FL 32707

St Johns Park Industrial Park
New Construction - 550,066 SF
Construction
Sanford, FL 32771

El Dorado Furniture / Altamonte Springs
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Altamonte Springs, FL 32701

Oviedo Mall Redevelopment
Demolition, New Construction, Infrastructure - 128,850 SF
Pending Verification
$150,000,000 CJ est. value
Oviedo, FL 32765

Last Updated 09/06/2022 07:01 PM
Project Title

SR 46 Water Main Replacement

Physical Address View project details and contacts
City, State (County) Sanford, FL 32771   (Seminole County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $4,113,089 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Project replaces 8" C.I. Water Main (WM) which is located in the SR 46 travel lane with new 12" WM constructed outside of SR 46. The new 12" WM starts at 24th Pl./ US 17-92, extending east and south along 24th Pl., Oak Ave., 25th Pl. / Palm Dr., and Mellonville Ave., ending at the SR 46 / Mellonville Ave. intersection. The side street WM construction includes new 8" WM along Magnolia Ave., Palmetto Ave., Poinsetta Ave., Princeton Ave., Yale Ave., Orange Ave., Willow Ave., and Bay Ave. New 1"-2" PE WM is to be located along SR 46 under the sidewalk, reconnecting to water meters. Existing WM in SR 46 is to be taken out of service and grouted between Oak Ave. and Mellonville Ave. New WM construction includes open cutting approx. 5,320-ft of 12" PVC WM, 4,100-ft of 8" PVC WM, 315-ft of 6" PVC WM, and 3,300-ft of 1"-2" PE WM. Directional drilling includes approx. 2,680-ft of 12" PE WM, 3,370-ft of 8" PE WM and 800-ft of 2" PE WM. Jack and bore construction (186' of 20"-24" steel casing) is also included. This project is being supported, in whole or in part, by federal award number FAIN 1505-0271, awarded to the City of Sanford by the U.S. Department of the Treasury. Question End Date : 7/18/2022 5:00 PM

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents