Similar Projects
River Water Intrusion - Groups 2 and 3 Improvements, Package C
Infrastructure
Bidding
$220,000 CJ est. value
Bellevue, KY 41073

Grade and Drain - US-27
Infrastructure
Bidding
$2,000,000 CJ est. value
Alexandria, KY 41001

Wilbers Road Reconstruction
Post-Bid
Less than $350,000 est. value
Fort Thomas, KY 41075

Bellevue and Dayton Joint Roadway Resurfacing
Infrastructure
Post-Bid
Dayton, KY 41074

2021 Sidewalk Repairs
Results
Fort Thomas, KY

Asphalt Resurfacing
Results
KY

Highlands High School Fieldhouse Parking Lot (Johnson Elementary School - Bid Package 2)
Infrastructure
Post-Bid
$80,000 est. value
Fort Thomas, KY 41075

Asphalt Resurfacing
Results
KY

Fall 2022 Resurfacing
Infrastructure
Post-Bid
$300,000 est. value
California, KY

South Ward Avenue Improvements
Results
Bellevue, KY 41073

Roadway Lighting Project
Infrastructure
Post-Bid
$200,000 CJ est. value
Highland Heights, KY 41076

Resurfacing Spring FY 2021
Results
Newport, KY

Dayton SRTS
Results
$191,962 est. value
Dayton, KY

Joyce Avenue and Blossom Lane Improvements
Results
Less than $402,615 est. value
Southgate, KY 41071

Campbell County High School Paving Improvements 2021
Results
Less than $185,000 est. value
Alexandria, KY 41001

Last Updated 07/28/2022 09:02 PM
Project Title

Construction of 180' of new sidewalk along the east side of S. Foote Avenue

Physical Address View project details and contacts
City, State (County) Bellevue, KY 41073   (Campbell County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $30,681 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bellevue S. Foote Sidewalk Sealed Bids will be received by the City of Bellevue for the S. Foote Sidewalk. The scope of work includes the construction of ADA compliant sidewalk between the existing sidewalk and Grandview Elementary School's parking lot. Last Addendum shall be issued on July 12th, 2022 by 5:00 pm. Contractors are encouraged to utilize local Vendors and Suppliers. City of Bellevue 616 Poplar Street Bellevue, KY 41073 (859) 431-8888 nikki.hill@primeeng.com. Any bids received after this time will not be considered. The City of Bellevue (OWNER) reserves the right to waive any informalities or to reject any or all bids. This contract is considered a Lump Sum Contract. Bidders and DBE subcontractors must be prequalified with the Kentucky Transportation Cabinet and possess a Certificate of Eligibility at the time of the bid opening. All other subcontractors must be prequalified when accepting subcontracts. Project is subject to tree clearing restrictions in June and July. Each BIDDER must deposit with its bid, security in the amount, form, and subject to the conditions set forth in the Instructions to Bidders. Project to be completed prior to the first day of school August 17th, 2022. No BIDDER may withdraw its Bid within sixty (60) consecutive calendar days after the actual date of the opening thereof. No price escalation during the time of the Construction Contract shall be considered.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents