Similar Projects
Plumbing Repair Services
Term Contract
Design
New Haven, CT 06510

New Home Port for USCG Cutter EAGLE, Coast Guard Museum - USCGC EAGLE
Infrastructure
Bidding
$5,000,000 CJ est. value
New London, CT 06320

Filter Underdrain and Media Replacement at the Lake Gaillard Water Treatment Plant - Filter Nos. 13, 14, 15, & 16
Infrastructure
Bidding
$500,000 CJ est. value
North Branford, CT 06471

DLA OWS Fuel Tank Replacement
Renovation
Sub-Bidding
$5,000,000 CJ est. value
Groton, CT 06340

Plumbing, Heating and AC On-Call Services
Alteration
Post-Bid
New Milford, CT

On Call Services - All Trades - Citywide
Term Contract
Post-Bid
Bridgeport, CT

Citywide Plumbing Maintenance and Repair
Alteration
Results
Stamford, CT

Plumbing Services - On Call
Term Contract
Results
West Hartford, CT

Plumbing Services - On Call
Term Contract
Post-Bid
Hartford, CT

Pool Repairs at High Schools
Renovation
Results
$538,997 CJ est. value
New Haven, CT 06510

Contractors for Electrical, Plumbing, and HVAC
Term Contract
Post-Bid
Naugatuck, CT

SCADA System Upgrades
Renovation
Results
$4,254,998 CJ est. value
Bristol, CT 06010

Plumbing Services
Alteration
Post-Bid
Shelton, CT

Sewer Repair and Related Construction Services
Infrastructure
Results
$7,988,100 CJ est. value
Hartford, CT 06103

Cafeteria Sink Replacement Academy
Alteration
Post-Bid
$100,000 est. value
East Haven, CT

Last Updated 07/20/2023 08:03 AM
Project Title

Brookside Road Pump Station Replacement

Physical Address View project details and contacts
City, State (County) Newington, CT 06111   (Hartford County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $3,575,900 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work shall consist of all labor, equipment, fees, permits, and other related costs necessary to provide for the replacement of the Brookside Road Wastewater Pump Station along with support equipment and accessories as shown and specified. Bidders are directed to Section 01010 Summary of Work for specific details. The Work shall be located in the Town of Newington; in the State of Connecticut as shown on the Bidding Documents. Prospective Bidders must attend the Pre-Bid Conference and provide requested information on the sign-in sheet at the start of the Pre-Bid Conference and initial the sign-in sheet following the conclusion of the Site Tour. 6/15/2023 1:30 PM - 6/15/2023 2:30 PM QUESTION DEADLINE - 6/23/2023 4:00 PM Project is subject to State Prevailing Wage and reporting requirements as specified in project documents. Project is tax-exempt. SBE set asides. Addendum #1-#4 have been issued as of 7-11-2023.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents