Similar Projects
Biennial Construction and Maintenance Contract
New Construction, Infrastructure
Post-Bid
Charleston, WV

Olympia Fields Booster Station Relocation Project
Renovation
Results
Scott Depot, WV

11th Street Pump Station Stabilization
Infrastructure
Results
Huntington, WV 25701

Wastewater Pump Stations Improvements Project
Renovation
Results
Ansted, WV

Contract IIIG Wastewater Collection and Treatment System Improvements
Alteration
Results
$8,995,000 est. value
Wheeling, WV

SAPP's Run and State Route 73 Sewage Lift Station Replacements
New Construction
Results
Fairmont, WV

Inflow and Infiltration Rehabilitation
New Construction
Results
Charleston, WV

Exit 1 Development
Infrastructure
Results
Bluefield, WV

Water System Improvements
New Construction
Results
$9,255,000 est. value
Fairmont, WV 26554

Franklin Elementary Sewer Extension
Renovation, Infrastructure
Results
Wellsburg, WV 26070

Gerrardstown Pump Station, Forcemain and Wastewater Treatment Plant Decommission Project
New Construction
Results
Charleston, WV

Midway Pump Station Building
New Construction
Post-Bid
Bluefield, WV

Lift Station Improvements
New Construction
Results
$1,200,000 est. value
Charleston, WV

Sanitary Sewer Rehabilitation and Lift Station Relocation
Infrastructure
Bidding
Milton, WV

Last Updated 01/17/2022 09:20 AM
Project Title

Chesterfield, James Street and Roosevelt Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Charleston, WV 25304   (Kanawha County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work covered by this Advertisement for Bids includes the following: Contract 21-1 Chesterfield, James Street & Roosevelt Lift Station Improvements For the Chesterfield Lift Station, work includes installing a new duplex submersible pumping system in an existing steel lift station; replacing piping and valves in the lift station; electrical improvements; landscaping; site work; and select demolition, together with necessary appertaining work. For the James Street Lift Station, work includes installing new duplex submersible pumping system in a new wet well; installing a new precast concrete valve vault; installing a diesel engine permanent bypass pump; installing a new force main; electrical improvements; and site improvements, together with necessary appertaining work. For the Roosevelt Lift Station, work includes select demolition inside of the existing wet well and valve vault; installing new duplex submersible pumping system inside of the wet well; installing new piping and valves in the existing valve vault; replacing the existing force main with a larger force main; electrical improvements; and site improvements, together with necessary appertaining work

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents