Similar Projects
1130 North Drainage Improvements - City of Saint George
Infrastructure
Conception
$1,400,000 CJ est. value
St George, UT 84770

Bloomington Pickleball Courts - City of Saint George
Infrastructure
Conception
$1,174,041 CJ est. value
St George, UT 84790

Autocamp Zion
New Construction - 8,441 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Virgin, UT 84779

3000 East Widening - 1580 South To Seeg Drive - City of Saint George
Infrastructure
Design
$13,100,000 CJ est. value
St George, UT 84790

RFP Construction Manager - General Classroom Building
New Construction, Infrastructure
Bidding
$45,750,000 CJ est. value
St George, UT 84770

300 West Sewer Project
Infrastructure
Bidding
$420,000 CJ est. value
Hurricane, UT 84737

State Bank of Southern Utah
New Construction, Infrastructure - 12,775 SF
Sub-Bidding
$1,000,000 CJ est. value
St George, UT 84790

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

Slurry Seal Project 2021
Results
Washington, UT 84780

Washington City 3650 South Extension Sugar Plum to Majestic Hills project
Results
$935,965 est. value
Washington, UT 84780

Black Desert Resort
New Construction
Construction
Ivins, UT

Sand Hollow Gateway Resort
New Construction, Infrastructure
Pending Verification
$125,000,000 CJ est. value
Hurricane, UT 84737

Sand Hollow Gateway Resort
New Construction, Infrastructure
Pending Verification
$125,000,000 CJ est. value
Hurricane, UT 84737

Riverside Drive Sewer Main Replacement R 11 Reach 1 - 62-6200-7970 - City of Saint George
Infrastructure
Conception
$3,500,000 CJ est. value
St George, UT 84790

Last Updated 09/06/2022 02:09 PM
Project Title

SR-18; Ledges to Diamond Valley and Veyo to MP 29.5

Physical Address View project details and contacts
City, State (County) Brookside, UT 84782   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

County: Washington This Project Requires Using the Electronic Certified Payroll Program. See Attachment to Notice to Contractors. This is a Working P+t (Price + Time) Project. The Department Will Not Hold Retention on This Project. Per Utah State Code A 13-8-5 (1) Prime Contractors Cannot Hold Retention. Refer to Utah Code A 13-8-5 (1) for More Information. Wage Rates: Apply Engineer's Estimate: Greater Than $10M but Less Than or Equal $15M Mandatory Prequalification Required (Qualified Health Insurance Required) Project Location: SR-18; Ledges to Diamond Valley & Veyo to MP 29.5 The principal items of work are as follows (for all items of work see attachment): SMA - 1/2 inch HMA - 1/2 inch HMA - 3/8 inch The project is to be completed: to be determined by competitive bid Project information can also be reviewed at the main office in Salt Lake City, its Region offices, and its District offices in Price, Richfield, and Cedar City. Each bidder must submit an electronic bid bond from an approved surety company using UDOT's Electronic Bid System (EBS); or in lieu thereof, cash, certified check, or cashier's check for not less than 5% of the total amount of the bid, made payable to the Utah Department of Transportation, showing evidence of good faith and a guarantee that if awarded the contract, the bidder will execute the contract and furnish the contract bonds as required. The right to reject any or all bids is reserved. Additional information may be secured at the office of the Utah Department of Transportation, (801) 965-4346 UDOT - SR-18; Ledges to Diamond Valley and Veyo to MP 29.5 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents