Similar Projects
US-270B - Grade, Drain and Surface
Infrastructure
Conception
$14,500,000 CJ est. value
Shawnee, OK 74801

US-270B - Grade, Drain and Surface
Infrastructure
Conception
$14,500,000 CJ est. value
Shawnee, OK 74801

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Wastewater System Improvements
Renovation, Infrastructure
Bidding
$61,503,195 CJ est. value
Shawnee, OK 74801

Wastewater System Improvements
Renovation, Infrastructure
Bidding
$61,503,195 CJ est. value
Shawnee, OK 74801

Resurface (Asphalt)
Post-Bid
OK

Resurface (Asphalt)
Post-Bid
OK

Resurface (Asphalt)
Results
OK

Slabjacking and Subsealing Services
Infrastructure
Results

Kickapoo Street Sidewalk Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Shawnee, OK 74801

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Resurface (Asphalt) - US-177
Infrastructure
Results
OK

Bethel Volunteer Fire Department
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Bethel Acres, OK 74801

Resurface (Asphalt) County Road (Old State Highway 18)
Infrastructure
Results
$1,563,638 est. value
Shawnee, OK 74804

Cammack Street Gravity Relief Line
Demolition, Infrastructure
Results
$626,331 CJ est. value
Shawnee, OK 74804

Last Updated 07/26/2022 04:32 PM
Project Title

Bethel Volunteer Fire Department

Physical Address View project details and contacts
City, State (County) Bethel Acres, OK 74801   (Pottawatomie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $3,525,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of furnishing all required materials, supplies, equipment and tools to perform all necessary labour for the grading, drainage and surface of driveway & parking lot as specified in the plans. All bids are to be submitted to Mr. Steve Byrd with EST Inc. at the above-mentioned Antlers Office of EST, Inc. It is advised that any potential bidder visit the construction site prior to the pre-bid meeting. The Choctaw Nation of Oklahoma reserves the right to reject any and all bids. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents