Similar Projects
Church Street Waterline Replacement
Infrastructure
Bidding
$14,000,000 est. value
Central, SC 29630

Clemson Research Park and Boscobel Pump Station Improvements
Renovation
Bidding
$400,000 est. value
Anderson, SC

Coward Water Imporvements-2019
Post-Bid
Coward, SC

Lake Rabon Raw Water Pump Station Surge Tank Improvements
Post-Bid
$600,000 to $700,000 est. value
Laurens, SC

McRae Road Pump Station Upgrade
Results
Camden, SC 29020

Regional Pump Station Upgrades
Results
Less than $4,279,100 est. value
North Charleston, SC 29419

Three Bridges / Cely Road Transmission Main
Infrastructure
Bidding
$352,000 est. value
Easley, SC 29642

Sewer and Water Lines Project
Post-Bid
Florence, SC 29063

Enhancement - S-3054 Richland Co
Results
SC

Rehabilitation Of Pump Station #339
Renovation
Bidding
$1,200,000 est. value
North Charleston, SC

Advanced Metering Infrastructure System
Post-Bid
West Columbia, SC

88 Connector Transmission Main
Results
Easley, SC 29642

Willow Oaks Water System Improvements
Infrastructure
Bidding
$250,000 to $300,000 est. value
Clover, SC 29710

5 Mueller Super Centurion 250 Fire Hydrants
Post-Bid
York, SC

Mahaffey Road Wastewater Line Replacement Project
Results
Williamston, SC 29697

Reported 05/13/2022 12:00 AM
Project Title

Crabtree Force Main/Park Hill Pump Station

Physical Address View project details and contacts
City, State (County) Conway, SC 29526   (Horry County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $550,000 [brand] Estimate
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the construction of a new sewer lift station at Park Hill and approximately 22,548 LF of 24-inch and 613 LF of 8-inch force main, appurtenances, site work, and all electrical and controls as shown on the Contract Drawings and included in the detailed specifications. The new station will intercept flow currently discharging into Crabtree Pump Station. The project is bid as two separate schedules and will be awarded separately.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents