Similar Projects
New Science and Technology Center - Carl Sandburg College
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Galesburg, IL 61401

Scooters Coffee / Galesburg
New Construction, Infrastructure - 668 SF
Design
$200,000 CJ est. value
Galesburg, IL 61401

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Water System Improvements - Phase II
Infrastructure
Bidding
$900,000 CJ est. value
Williamsfield, IL 61489

Water Main Improvements
Infrastructure
Post-Bid

Watermain Materials
Infrastructure
Post-Bid
Galesburg, IL

Construction of Replacement of Approximately 500 Lead Service Lines
Infrastructure
Results
$300,000 est. value
Galesburg, IL

New Library Building and Site improvements
New Construction - 70,160 SF
Construction
$13,000,000 to $13,500,000 est. value
Galesburg, IL 61401

2022 Miscellaneous Sidewalk Replacement
Infrastructure
Construction
$290,749 CJ est. value
Galesburg, IL 61401

Bridge Preservation
Infrastructure
Bidding
$700,000 CJ est. value
Williamsfield, IL 61489

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Tennis Court Resurfacing
Infrastructure
Bidding
$40,000 CJ est. value
Galesburg, IL 61401

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

504 Modifications - Phase 4
Renovation
Bidding
$200,000 CJ est. value
Galesburg, IL 61401

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Post-Bid
Schaumburg, IL 60194

Last Updated 12/29/2022 06:31 PM
Project Title

KCHA Cedar Creek Drainage

Physical Address View project details and contacts
City, State (County) Galesburg, IL 61401   (Knox County)
Category(s) Heavy and Highway, Residential, Sewer and Water
Sub-Category(s) Single-Family Homes, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate - 12/09/22
Owner View project details and contacts
Architect View project details and contacts
Description

Each firm that submits a bid is responsible to carefully review and comply with the following and/or the attached Terms, Conditions and Instructions, and by submitting a bid agrees to do so. If you have any questions regarding this bid or the documents attached, you may use the Questions and Answer area. This will save both you and the Agency time in communication along with allowing documentation of all inquiries and responses within one area for all vendors to view. Question Deadline 12/15/2022 at 3:00 PM CT The Project includes furnishing all labor and materials to complete all work as shown and described in Appendix A and as herein specified. Complete all work in accordance with the Drawings, Specifications, building codes, governmentregulations, and commonly accepted trade scope and practices.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents