Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

PA 36 to US 22
Infrastructure
Design
$3,940,000 CJ est. value
Hollidaysburg, PA 16648

PA 36 to US 22
Infrastructure
Design
$3,940,000 CJ est. value
Hollidaysburg, PA 16648

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Everett Road Water and Sanitary Sewer Project
Infrastructure
Post-Bid
East Freedom, PA 16637

SR 865 Waterline Replacement Project
Infrastructure
Post-Bid
Bellwood, PA

Milling of Bituminous Pavement
Infrastructure
Results
Tyrone, PA

State Game Lands 108 Bell'S Gap Road Maintenance
Infrastructure
Results
PA

O'Reilly Auto Parts (AT1) #6625 / Altoona
New Construction, Infrastructure - 7,135 SF
Construction
$1,300,000 CJ est. value
Altoona, PA 16601

O'Reilly Auto Parts (AT1) #6625 / Altoona
New Construction, Infrastructure - 7,135 SF
Construction
$1,300,000 CJ est. value
Altoona, PA 16601

Self Storage - Patton Township
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Altoona, PA 16601

Blair Gap Run Bridge
Demolition, New Construction, Infrastructure
Conception
$3,942,800 CJ est. value
East Freedom, PA 16637

I-99 Newry Pulloff to Plank Rd Intchg
Infrastructure
Design
$11,150,000 CJ est. value
Juniata Township, PA 16635

Last Updated 03/17/2023 09:32 AM
Project Title

East Christiana Street Waterline Replacement - Rebid

Physical Address View project details and contacts
City, State (County) Martinsburg, PA 16662   (Blair County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

EAST CHRISTIANA STREET WATERLINE REPLACEMENT The scope of work includes the installation of approximately 650 linear feet of 6-inch PVC waterline, one hydrant assembly, two connections to the existing potable water system, approximately 13 service connections, and all necessary appurtenances and restoration for said construction. Pennsylvania prevailing wage rates apply. Proposals must be upon the forms furnished by the Authority. The bid must be accompanied by a certified check or bid bond in the amount of ten percent (10%) of the bid, made payable to the Authority to guarantee the bidder's entrance into the contract if given the award. No bid bond shall be waived or returned because the Bidder has failed to or cannot comply with any requirements as set forth in the plans, specifications, or any applicable statutes of the State of Pennsylvania or any applicable municipal ordinances. Any questions on ordering the bid documents are to be directed to Clem Sutton at 412-231-7700 or csutton@dittohq.com. Any technical questions regarding the bid documents are to be directed to LSSE (412-264-4400, Ext. 212). The Authority reserves the right to reject any or all proposals and to waive any informalities in the bidding. No bid may be withdrawn for ninety (90) calendar days after the scheduled time for receipt of bids. MARTINSBURG - CONTRACT NO. 22-W1 (RE-BID) EAST CHRISTIANA WATERLINE REPL A-2 ADVERTISEMENT (5/2017) The Authority shall (a) award the construction contract to the lowest responsible bidder therefore, or (b) reject all bids received within ninety (90) days of the date of bid opening; provided, however, that the Authority may, in its sole discretion, delay such award or rejection for up to one hundred twenty (120) days from the bid opening date until the Authority has received all required approvals from other governmental agencies. Bidders on this work will be required to comply with Title VI of the Civil Rights Act of 1964.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents