Similar Projects
Geotextile Material
Infrastructure
Bidding
Ballwin, Beaufort, Bella Villa, Cedar Hill, Country Club Hills, Creve Coeur, Crystal Lake Park, Eureka, Festus, Normandy, Pacific, Saint Charles, Saint Clair, Saint Louis, Sappington, Wentzville, MO 63141

Geotextile Material
Infrastructure
Bidding
Ballwin, Beaufort, Bella Villa, Cedar Hill, Country Club Hills, Creve Coeur, Crystal Lake Park, Eureka, Festus, Normandy, Pacific, Saint Charles, Saint Clair, Saint Louis, Sappington, Wentzville, MO 63141

Forest Park Waterway
Post-Bid
$7,102,880 est. value
Saint Louis, MO 63110

Harrison County Courthouse Landscape and Drainage Improvements
Post-Bid
MO

Elson Street Culvert Replacement
Results
Kirksville, MO

Corby Pond Restoration
Results
Saint Joseph, MO 64506

Thermoplastic Pipe 2022
Term Contract
Bidding
MO

Harrison County Courthouse Landscape and Drainage Improvements
Post-Bid
Bethany, MO 64424

West Hangar Drainage Improvements
Results
Chesterfield, MO 63005

Reinforced Concrete Pipe 2022
Term Contract
Bidding
MO

Elementary Library Drainage
Infrastructure
Post-Bid
Iberia, MO

Paddock Creek Improved Channel Repair
Results
$597,000 est. value
Chesterfield, MO

Corrugated Metal Pipe
Infrastructure
Bidding
Josephville, Saint Charles, Saint Peters, Wentzville, MO 63385

Woodbine Road Culvert Replacement
Infrastructure
Post-Bid
Saint Joseph, MO

Metal Pipe (CMP and Arch Pipe)
Results
MO

Last Updated 01/22/2022 08:57 AM
Project Title

Slope Repair

Physical Address View project details and contacts
City, State (County) MO   (Clay County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J4I3484 Route I-35/I-29 CLAY County. Slope repair ramp from Southbound I-29 to Northbound I-35, the total length of improvement being 0.066 miles.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents