Similar Projects
2023 Annual Contract for Sanitary Sewer System Repairs and Service Lateral Installations
Term Contract
Sub-Bidding
Long Branch, NJ 07740

Camera System
Renovation
Sub-Bidding
$340,000 CJ est. value
Maurice River, NJ 08327

Supply and Deliver Digicode Audio Frequency Track Circuit Cable for Path Rail
Term Contract
Post-Bid

Supply and Deliver Digicode Audio Frequency Track Circuit Cable for Path Rail
Term Contract
Post-Bid

Physical Security/Access Control Systems (PS/AC) Multiple Award Construction Contract (MACC)
Results
Less than $99,000,000 est. value

Physical Security/Access Control Systems (PS/AC) Multiple Award Construction Contract (MACC)
Results
Less than $99,000,000 est. value

Gorman Hall South Renovation
Renovation
Construction
Lincroft, NJ

Fire Alarm Replacement Project
Renovation
Construction
$571,000 CJ est. value
Montvale, NJ 07645

NEFO Earle Security System Installation
Renovation
Sub-Bidding
$100,000 CJ est. value
Colts Neck, NJ 07722

Toll System Integrator to Provide a Turnkey all Electronic Toll System for New Jersey Public Toll Authorities
Alteration
Post-Bid
Woodbridge, NJ

RFI - Home Intrusion Detection Systems
Results

Main Entrance Canopy and Security Vestibule at Nellie K. Parker School
Renovation
Sub-Bidding
$90,000 CJ est. value
Hackensack, NJ 07601

IT Infrastructure and Storage Upgrade
Alteration
Post-Bid
Asbury Park, NJ

Cable/Satellite Services at FCI FAIRTON
Term Contract
Results
Fairfield, Fairton, NJ 08320

Installation of Entry Intercom System
Renovation
Sub-Bidding
$70,000 CJ est. value
Asbury Park, NJ 07712

Last Updated 08/18/2023 09:22 AM
Project Title

Dust Collection System Replacement Project at Ridgewood High School

Physical Address View project details and contacts
City, State (County) Ridgewood, NJ 07450   (Bergen County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $535,668 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of Aug 18, 2023 the project has not yet been awarded. A timeline for award has not yet been established . This project consists of the replacement of the dust collection system at Ridgewood High School. The scope of work generally consists of the removal of the existing dust collection system ductwork and equipment in its entirety and provide an upgraded dust collection system for the Ridgewood High School Wood Shop. All bidders must use and complete all bid forms and must comply with every requirement contained in the instructions and specifications. Bids are to be marked in a sealed envelope and delivered to Kathryn Davenport, Interim Business Administrator, with the name of the project, "Ridgewood High School Dust Collection System Replacement Project" plainly marked on the front of the envelope. The bid opening process will commence at the advertised date and time located at the Ridgewood Board of Education District Board Offices, located within 49 Cottage Place, Ridgewood, New Jersey 07450. Statement of Ownership Requirement: Pursuant to N.J.S.A. 52:25-24.2, Bidders shall submit a statement setting forth the names and addresses of all persons and entities that own ten percent or more of its stock or interest of any type at all levels of ownership. A Non-Collusion Affidavit and a Contractor Questionnaire/Certification also must be submitted with the bid. The bid package will also include other documents that must be completed and returned with the bid. Failure to comply with Instructions to Bidders and to complete and submit all required forms, may be cause for disqualification and rejection of the bid. The Board of Education reserves the right to reject any or all bids pursuant to N.J.S.A. 18A:18A-2(s), (t), (x), (y), 18A:18A-4(a), 18A:18A-22, and to waive any informalities. The Ridgewood Board of Education reserves the right to reject any or all bids and waive any informality in the bidding process in accordance with the law if it is in the best interest of the Board of Education. The contract, if awarded, shall be awarded to the lowest responsible bidder whose bid is responsive in all material respects to the bid requirements. No bid shall be deemed accepted until the adoption of a formal resolution by the Board of Education. Kathryn Davenport Interim School Business Administrator Ridgewood Board of Education 49 Cottage Place, Ridgewood, NJ 07450 Any questions which a bidder may have shall be brought to the attention of the Architect via email only at kdougherty@fkarch.com.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents