Similar Projects
SR 524/Olympic Ave Vic To 48th Ave W Vic - ADA Compliance
Infrastructure
Design
$2,296,000 est. value
WA

Ballinger Park Trail
Infrastructure
Bidding
$200,000 to $300,000 est. value
Mountlake Terrace, WA 98043

273rd Place North West Pedestrian Path
Infrastructure
Bidding
$135,000 to $150,000 est. value
Stanwood, WA 98292

8th Street Improvements Project
Alteration
Post-Bid
$739,767 est. value
Marysville, WA

HASCO Properties - Asphalt Sealcoat, Stripe, and Miscellaneous Repairs
Infrastructure
Post-Bid
$3,000,000 est. value
Everett, Lake Stevens, Lynnwood, Marysville, Mountlake Terrace, Snohomish, WA 98043

Nugget Park Sidewalk Replacement
Infrastructure
Results
$275,000 to $350,000 est. value
Brier, WA 98036

Fisherman's Harbor Commercial Development Parcels A8 & A17
New Construction, Infrastructure, Alteration - 6,000 SF
Results
$4,300,000 to $4,700,000 est. value
Everett, WA 98213

Pavement Rehabilitation and Safety Improvements
Infrastructure
Post-Bid
$700,000 est. value
Tulalip Bay, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Hermosa Heights Project
Infrastructure
Post-Bid
$700,000 est. value
Tulalip Bay, WA

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

Silver Lake Trail
Infrastructure
Post-Bid
$1,320,665 est. value
Everett, WA 98208

SR 525, Mukilteo Pedestrian and Traffic Improvements MP 8.32 to MP 8.43
Infrastructure
Results
WA

SWR - Hole Drilling - Sky Valley Transmission Line Project
Infrastructure
Post-Bid
$150,000 est. value
Monroe, WA

2021 Complete Streets Pedestrian Improvements Project
Infrastructure
Results
$130,000 to $150,000 est. value
Mill Creek, WA

Last Updated 07/18/2022 07:12 AM
Project Title

Interurban Trail to YMCA Pedestrian Improvements

Physical Address View project details and contacts
City, State (County) Everett, WA   (Snohomish County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $290,691 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work being performed includes, but is not limited to, furnishing all labor, materials and equipment necessary to construct new pedestrian access facilities and associated appurtenances between Alta Drive/Interurban Trail, to Beaumont Drive, and Colby Avenue. Includes a new crosswalk on Colby Avenue at Emma Yule Neighborhood Park with three Rectangular Rapid Flashing Beacons, a raised-median refuge island with pedestrian cut-through, two ADA ramps and performing all Work as required by the Contract Documents.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents