Similar Projects
Last Updated | 03/07/2023 05:59 PM |
Project Title | Folsom Area Stormwater Improvements - Soma and Mission Districts Sewer Replacement |
Physical Address | View project details and contacts |
City, State (County) | San Francisco, CA 94103 (San Francisco County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $7,522,040 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | WW24700 The objective of the project is to replace and/or upsize various sewers in the South of Market area and the Mission District. The work is to be performed in San Francisco, California. The Engineer's estimate is $8,200,000. The objective of the project is to replace and/or upsize various sewers in the South of Market area and the Mission District. The work is to be performed in San Francisco, California. Bid discounts may be applied as per San Francisco Administrative Code Chapter 14B and Section 2.01 of Contract Monitoring Division Attachment 1. The Pilot Neighborhood/Zip Code Local Business Enterprise (LBE) Program applies to this project. And for this project, the following Supervisorial District(s) 6 and 9 and project zip code(s) 94103 and 94110 will be used to apply the applicable bid discounts, if any. The Local Business Enterprise (LBE) subcontracting requirement is 20.00%. The LBE subcontracting requirement can only be met with Contract Monitoring Division certified San Francisco Micro and Small-LBEs. SFPUC-LBEs cannot be counted towards meeting the LBE subcontracting requirement(s). Prime and Joint Venture level LBE participation cannot be counted towards meeting any of the LBE subcontracting requirement(s). LBE subcontractors must be certified with Contract Monitoring Division in the scope of work they are being listed to perform. All Bidders shall submit documented Good Faith efforts with their Bids as directed on Contract Monitoring Division Form 2B, except those who exceed the above-stated subcontracting requirement(s) by at least 35%. Refer to Contract Monitoring Division Attachment 1. Failure to comply with Chapter 14B requirements may result in a Bid being deemed non-responsive and ineligible for Contract award. Please contact Michelle Kassatly at (408) 641-8031 or michelle.kassatly@sfgov.org for further information. Subcontracting opportunities may include, but not limited, to the following major types of work: pavement demolition, excavation, pipe laying, backfilling, pavement restoration, and traffic control. Bidders are encouraged to submit a Safety Prequalification Form at least 3-weeks prior to the date of Bid opening; however, Bidders are required to submit the completed Form no later than 7 calendar days prior to the date of Bid opening. SFPUC will notify Bidders who have passed the Safety Prequalification prior to or on the date of Bid opening. Bidders must pass the Safety Prequalification prior to SFPUC considering their bid submission complete. Refer to Section 00 21 13 -Instructions to Bidders, Bidder Qualifications and Section 00 45 12 - Safety Prequalification for additional information. A Class A California Contractors License is required to bid. Furthermore, each listed subcontractor must possess appropriate active licenses for the work each subcontractor will be performing. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |