Similar Projects
Construction of Grand Mission Regional Detention System Maintenance
Post-Bid
$600,000 est. value
TX

Construction of Sidewalk, Planting and Irrigation
Post-Bid
Bastrop, TX

Concrete Walkway Project
Results
$25,000 to $100,000 est. value
Denton, TX 76209

ADA Compliant Sidewalk - Building 20709
Results
$25,000 to $100,000 est. value
El Paso, TX

Texas City Park & Ride - Administration Facility
New Construction - 13,100 SF
Construction
Texas City, TX 77591

Police Training Facility - Berm Improvements
Construction
Less than $2,200,000 est. value
Conroe, TX 77301

Dry Creek Regional Detention Pond Phase 2
Post-Bid
$844,430 est. value
Rosenberg, TX

New Front Easement Reconnections
Results
Less than $1,875,000 est. value
Houston, TX

Raw Water Intake Repair at Lake Somerville
Post-Bid
Brenham, TX

Exploration Green Detention Facility Phase 3A
Results
Less than $5,520,000 est. value
Clear Lake City, TX 77058

Parking Lot Improvement Project
Post-Bid
San Perlita, TX 78590

Trench Drain Installation - Animal Care Campus
Results
Irving, TX 75038

Downtown Revitalization
Post-Bid
$300,000 est. value
Terrell, TX

Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Central Pine Street and Pine Market Avenue (East of FCT)
Results
TX

Ditch and Culvert Cleaning
Post-Bid
Less than $291,050 est. value
TX

Last Updated 12/03/2019 08:35 AM
Project Title

Railroad Street Parking Lot and Drainage Improvements Project

Physical Address View project details and contacts
City, State (County) Navasota, TX   (Grimes County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,009,541
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the construction of approximately 440’ of 7’ x 7’ reinforced concrete box culvert and associated inlets from Cedar Creek to the east side of State Highway 105 (E. Washington Ave). A new parking lot will also be constructed on the north side of State Highway 105 (E. Washington St.) at the termination of Railroad St. adjacent to Cedar Creek.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents