Similar Projects
Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

CSAH 10 Pavement Reclamation and Culvert
Infrastructure
Bidding
Corcoran, MN

Plymouth Marketplace Drainage Improvements - Drainage Channel Restoration
Infrastructure
Bidding
Plymouth, MN 55447

Directional Boring
New Construction
Post-Bid
Minneapolis, MN 55401

Bluff 25 Culvert Replacement
Post-Bid
Eden Prairie, MN

2020 Pond Maintenance
Results
Golden Valley, MN 55427

South Lake Minnetonka Public Safety Facility Improvements
Results
Shorewood, MN

Plum Tree East Drainage Improvement
Results
Plymouth, MN 55446

2021 Einer Anderson Field Retaining Wall Replacement
Renovation
Results
Minnetonka, MN 55345

CSAH 156 Culvert Replacement and Pavement Repair
Results
New Hope, MN 55427

Opus Area Improvements Phase 2
Results
Minnetonka, MN

2021 Pond Maintenance Improvements
Results
$150,000 est. value
Plymouth, MN

2021 Street Improvement
Results
$2,200,000 est. value
Minnetrista, MN

Culvert Repair, Replacement and UV Lining
Results
Eden Prairie, Minnetonka, Minnetrista, Orono, MN

Everest Lane Streambank Stabilization Phase II
Results
$211,500 est. value
Maple Grove, MN 55311

Last Updated 10/18/2021 11:53 AM
Project Title

Mt. Olivet Streambank Restoration and Parkers Lake Drainage Improvements

Physical Address View project details and contacts
City, State (County) Plymouth, MN   (Hennepin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: 23 Tree Clearing and Grubbing 45 L F Remove Sewer Pipe (Storm) 1,500 C Y Excavation - Common (P) 50 S Y Bituminous Patching 40 L F 18" RC Pipe Sewer Des 3006 CL V 51 TON Riprap Class III (Fieldstone) 3 EACH Rock Ditch Check 1 EACH Rock Log Ditch Check 71 L F Anchored Slope Protection The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents