Similar Projects
UNC Charlotte Reclaimed Water Infrastructure
Infrastructure
Bidding
$2,500,000 est. value
Charlotte, NC

2018 Water Line Replacements
Infrastructure
Bidding
$3,000,000 to $4,000,000 est. value
Oxford, NC

FY20 Short Water Line Extensions Phase 1
Post-Bid
$350,000 to $450,000 est. value
Monroe, NC 28112

East River Phase 2 Project
Post-Bid
Clayton, NC 27527

Faculty Drive Waterline Construction
Results
Wingate, NC

2019 Automated Meter Reading Project Phase III
Results
Jacksonville, NC 28540

Water Main Rehabilitation Program
Infrastructure
Bidding
Greenville, NC 27834

ASU - Sanford Hall Chilled Water Line Extension
Post-Bid
Boone, NC 28608

Bladen County Water District - Phase IV, Contract 3 - Water Meter Replacement Project
Results
NC

2021 On-Call Construction Services
Infrastructure
Bidding
Supply, NC

McGee's Crossroads Water District NC 210 Water Main Improvements
Post-Bid
Smithfield, NC 27577

Water Extension and Replacement along Faculty Drive, Dunleith Avenue, and Wood Street
Results
$1,340,811 est. value
Winston-Salem, NC

2021 Water and Sewer Point Repairs
Infrastructure
Bidding
Durham, NC

Open End Construction and Repair Service Contract
Term Contract
Post-Bid
Rocky Mount, NC

Forest Oaks Loop Water Line Extension
Results
Greensboro, NC

Last Updated 09/21/2021 10:43 AM
Project Title

853W Zone Improvements Phase 1 Transmission Mains Rocky River Road and Secrest Shortcut Road

Physical Address View project details and contacts
City, State (County) Monroe, NC 28110   (Union County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $22,420,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing the following major items: 1. Furnish and install approximately 24,300 LF of 36’’ ductile iron water transmission pipeline. 2. Furnish and install approximately 3,200 LF of 16’’ ductile iron water transmission pipeline. 3. Furnish and install all associated fittings, valves, air-release valve structures, blow-offs, tie-ins, interconnections, services, clearing, erosion control, cleaning, disinfection and testing, pipeline abandonment and all other pipeline work shown on the Drawings and described in the Specifications.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents