Similar Projects
Construct Wastewater Metering Station
New Construction
Design
$100,000 to $250,000 est. value
Decatur, GA 30033

Construct Wastewater Metering Station
New Construction
Design
$100,000 to $250,000 est. value
Decatur, GA 30033

RFP Engineering - Multi-Modal Study
Infrastructure
Bidding
$1,000,000 CJ est. value
Brookhaven, GA 30319

RFQ - Professional Services Architecture, Engineering, Surveying
Term Contract
Bidding
Stone Mountain, GA 30083

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

RFP Design - Legacy Park Track and Field Facility
New Construction, Infrastructure
Pending Verification
$400,000 CJ est. value
Decatur, GA 30030

RFQ Design - Architectural / Engineering Services for Dresden Elementary School Replacement
Demolition, New Construction, Infrastructure
Bidding
$100,000 CJ est. value
Atlanta, GA 30341

Rail Trail Extension
Term Contract
Post-Bid
Chamblee, GA

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

RFQ Design - Livsey Elementary School Major Building System
Renovation
Bidding
$34,500,000 CJ est. value
Tucker, GA 30084

Facility Needs Assessment
Term Contract
Post-Bid
Doraville, GA

Architect-Engineer Supplemental Services - Southeast Regional Office
Results

Last Updated 02/23/2023 03:04 PM
Project Title

RFP Engineering - Conceptual Design for Sidewalk Along Peeler Road at Multiple (2) Locations

Physical Address View project details and contacts
City, State (County) Dunwoody, GA 30338   (DeKalb County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Construction start expected March 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Conceptual Design for Sidewalk Along Peeler Road at Multiple (2) Locations. The City of Dunwoody is seeking to add sidewalk to the following locations along Peeler Road. 1. Along the eastern/southern side of Peeler Road from Huntington Hall to Equestrian Way. 2. Along the northern side of Peeler Road from Tilly Mill Road to Lakeside Drive. The city's typical section generally consists of a 2-foot minimum landscape buffer, with 4-foot preferred where feasible, and a 6-foot concrete sidewalk. Bike lanes shall be maintained where they currently exist. The proposed drainage network will need to be sketched in for informational and cost estimating purposes only, but the consultant shall plan on placing outfalls at logical positions throughout the corridor. The selected design engineering firm shall develop one concept level layout for each of the above mentioned locations with approximate limits and right of way or easement requirements using the City's latest Geographic Information System (GIS) data as well as a detailed cost estimate utilizing Georgia Department of Transportation's (GDOT) Pay Item Index. GIS Data will be provided to the selected consultant. This data includes, but not limited to, roadway centerlines, aerial imagery, topography, property lines, and existing stormwater infrastructure. Other items may be digitized into the best of the consultant's ability include existing fencing and utility poles. The City would like to limit right of way and easement acquisition for this project; however, understands there could be a need for it. As such, the concept plan should include the use of gravity retaining walls where feasible to minimize right of way impacts. The concept plan should also identify potential areas for right of way and easement purchases. Please include a project kick off meeting with City staff in your quote as well asintermediate deliverables at the 30% and 80% development stage to allow City staff to review and comment. The City is seeking a 60 day project schedule. These 60 days would commence at notice to proceed. Final deliverables to include a concept plan on aerial and project cost estimate (construction cost line items referencing GDOT Pay Items, approximate area for right of way and easements, stream mitigations, etc). Please refer to the graphical layout for project limits. Location 1 Begin Project: 33.932328, -84.308937 (approximate) End Project: 33.934758, -84.306765 (approximate) Location 2 Begin Project: 33.936590, -84.288169 (approximate) End Project: 33.940228, -84.278205 (approximate) The Method of Contractor Selection has not been determined at this time.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents