Similar Projects
L/A HVAC Testing and Balance
Post-Bid
Peoria, IL 61635

FSCC Chiller Maintenance
Post-Bid
Chicago, IL 60608

Replace Hvac System And Plumbing And Interior Renovation Phase 1
Renovation
Results
Less than $3,000,000 est. value
Paris, IL 61944

HVAC Upgrades - Herndon Building
Renovation
Results
Springfield, IL 62756

Abb Hvac Drivers
Term Contract
Post-Bid
Chicago, IL 60612

HVAC Replacement And Related Work
Renovation
Results
$275,000 to $300,000 est. value
Geneseo, IL 61254

Insulation Repair Services for Plumbing and Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL

Kinnikinnick Elementary School HVAC And Roof Replacement Summer 2021
Results
Less than $1,942,000 est. value
Roscoe, IL 61073

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

Burr Elementary School - LBP Mitigation and ACM Patch and Repair in the Ventilation System
Results
Chicago, IL 60622

D100 Fenton HS Auto Shop Exhaust Replacement
Post-Bid
Bensenville, IL 60106

Smyser Elementary School - LBP Mitigation in the Ventilation System
Results
Chicago, IL 60634

HVAC Piping Work at Hampshire High School
Post-Bid
Algonquin, IL

Bridge ES Filter Racks AHU #1, AHU #2
Results
Chicago, IL 60634

HVAC Air Filters- District Wide
Term Contract
Post-Bid
Algonquin, IL

Last Updated 02/21/2022 04:54 PM
Project Title

HVAC Equipment Replacement

Physical Address View project details and contacts
City, State (County) Carbondale, IL   (Jackson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $450,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DIVISION 1 - HEATING & VENTILATING WORK Demolition of suspended ceiling and grid, hung unit ventilators, condensers, related ductwork, diffusers, piping, conduit, wiring and controls; demolition of package air conditioning units and adaptor curbs; and replacement with new equipment, ductwork, controls, finishes and patching related building components affected by work.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 05 - Metals, Metal Fabrications.
Division 07 - Thermal and Moisture Protection, Thermal Insulation, Flashing and Sheet Metal, Firestopping, Joint Sealants.
Division 09 - Finishes, Gypsum Board, Acoustical Ceilings, Acoustical Tile Ceilings.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents