Similar Projects
Add Alternate Water Distribution System
Infrastructure
Design
$1,000,000 CJ est. value
Jackson, MS 39232

Add Alternate Water Distribution System
Infrastructure
Design
$1,000,000 CJ est. value
Jackson, MS 39232

Slide Repair at the SR 25 / SR 43
Infrastructure
Bidding
$5,000,000 CJ est. value
Brandon, MS 39042

Fannin Water Association Waterline
Infrastructure
Bidding
$250,000 CJ est. value
Brandon, MS 39047

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

College Street Waterline Replacement Project
Infrastructure
Post-Bid
Brandon, MS 39042

Flowood Drive/Highway 475 Water Main
Infrastructure
Results
Flowood, MS 39232

Industrial Park Waterline Extension
Infrastructure
Results
$327,368 est. value
Brandon, MS

Menasha Packaging Expansion
Addition, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Pelahatchie, MS 39145

Freedom Farms Phase 4A Waterline
Infrastructure
Bidding
$100,000 CJ est. value
Brandon, MS 39042

Utility Water Meter Project
Infrastructure
Post-Bid
Pearl, MS

2022 Brenmar Street Waterline Extension Project
Infrastructure
Results
Brandon, MS 39042

Rehabilitate Taxiway A, Phase 2 and Rehabilitate Taxiway B, Phase 1 at the Jackson-Medgar Wiley Evers International Airport
Infrastructure
Post-Bid
$525,000 CJ est. value
Jackson, MS 39208

2020 Water System Improvements
Infrastructure
Results
$200,000 est. value
Pelahatchie, MS

Construction of 10.656 Miles of Overlay
Infrastructure
Post-Bid
$250,000 CJ est. value
Brandon, MS 39042

Last Updated 06/16/2023 11:19 AM
Project Title

Winona EDA Contract III Wastewater Collection Rehab

Physical Address View project details and contacts
City, State (County) Richland, MS 39218   (Rankin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Manhole lining and rehabilitation, installing cured in place pipe liners (CIPPL), by-pass pumping, manhole frame and cover adjustments and replacements, sanitary-sewer point repairs, and sanitarysewer gravity pipe replacements. Also includes cleaning and CCTV of sanitary-sewer lines, smoke testing, manhole locates and inspections. Sanitary-sewer lines investigated and rehabilitated will range from 6-inch to 24-inch. This project will prioritize the rehabilitation efforts with some investigative efforts required. Results from the City of Winona 2021 CDBG Wastewater Collection Rehabilitation project will help guide this project's final scope.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents