Similar Projects
PA 531: Depot Road, Section 4
Infrastructure
Conception
$1,275,000 CJ est. value
Harborcreek, PA 16421

SR 19: I-90 to Rotunda Dr
Infrastructure
Conception
$2,830,000 CJ est. value
Summit Township, PA 16441

Poplar Street Townhomes
New Construction, Infrastructure - 15,436 SF
Design
$6,000,000 CJ est. value
North East, PA 16428

SR 8009 Ramp C over I-79
Infrastructure
Design
$75,000 CJ est. value
Erie, PA 16501

Niemeyer Road (T-463) Bridge
Infrastructure
Bidding
$5,000,000 CJ est. value
Waterford, PA 16441

Erie Group 231
Infrastructure
Bidding
$7,500,000 CJ est. value
Wattsburg, PA 16442

General Construction Site I Clarifier Equipment Removal and Replacement Project
Post-Bid
North East, PA

Site Improvements at Erie County 911 Building
Infrastructure
Post-Bid
Erie, PA 16509

Primary and Secondary Treatment Facilities Rehabilitation - General Construction
Renovation
Results
$4,046,000 est. value
Erie, PA 16507

Berry Global Warehouse and Distribution Building and Site Development Project (Rebid)
New Construction, Infrastructure - 90,000 SF
Results
$8,098,000 CJ est. value
Erie, PA 16502

BJ's Restaurant & Brewhouse / Mill Creek Mall
New Construction, Infrastructure - 7,662 SF
Pending Verification
$2,336,910 CJ est. value
Erie, PA 16508

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Erie 2022 Bridge Shotcrete Group
Infrastructure, Renovation
Design
$250,000 CJ est. value
Erie, PA 16504

Downtown Erie Active Transportation Project
Infrastructure
Bidding
$500,000 CJ est. value
Erie, PA 16507

Asbestos Abatement, Structure Demolition, and Site Restoration
Demolition, Infrastructure, Alteration
Post-Bid
Fairview, PA 16415

Last Updated 05/06/2023 06:31 PM
Project Title

Wastewater Treatment Plant Disinfection Reliability Improvements Project

Physical Address View project details and contacts
City, State (County) Erie, PA 16507   (Erie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Erie Sewer Authority is proposing to proceed with the Erie Sewer Authority Wastewater Treatment Plant Disinfection Reliability Improvements Project (the "Proj The method of Contractor Selection has not been Determined at this time

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents