Similar Projects
Northwestern Division Regional $115M Section 8(A) SB Set-Aside IDIQ MATOC
New Construction
Design

Northwestern Division Regional $115M Section 8(A) SB Set-Aside IDIQ MATOC
New Construction
Design

Construction of a New Area 9 Battalion Headquarters Transient Training Building
New Construction
Post-Bid
$1,500,000 est. value
Little Falls, MN

National Guard Readiness Center
New Construction
Post-Bid
$17,399,809 est. value
Luverne, MN 56156

Construction of Area 5 Battalion Headquarters
New Construction - 7,100 SF
Results
Little Falls, MN

Construction of Area 5 Dining Facilities - Buildings 5-042 and 5-041
New Construction
Results
Little Falls, MN

Aerial Port Facility
New Construction - 28,192 SF
Design
$10,000,000 to $25,000,000 est. value
Minneapolis, MN 55450

Vehicle Inspection Facility
New Construction
Post-Bid
Minneapolis, MN 55450

Renovation of the Fergus Falls MN National Guard Armory
Renovation - 36,000 SF
Results
$4,438,499 est. value
Fergus Falls, MN 56537

Mission Support Group Facility
New Construction - 22,564 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Minneapolis, MN

Duluth 88th Army Reserve Center
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Duluth, MN 55802

Last Updated 09/27/2021 08:18 AM
Project Title

Pokegama Log Pavilion Replacement

Physical Address View project details and contacts
City, State (County) Grand Rapids, MN 55744   (Itasca County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Supply, deliver, and install a new 24’ by 30’ log pavilion, concrete slab, sidewalks, and electrical utilities in the same location as the existing pavilion. Also includes the removal and disposal of the existing old log pavilion, slab and sidewalks.

Details

Military Facility, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents