Similar Projects
New Middle School #7
New Construction
Conception
Prosper, TX

High School #2 Construction
New Construction
Conception
Anna, TX

New Middle School
New Construction
Design
Rio Grande City, TX

Tafolla Middle School Project
New Construction
Design
San Antonio, TX 78207

TS Imelda Flood Reconstruction for Vidor Independent School District
Post-Bid
Vidor, TX 77662

IDEA Public School - Health Professionals - Phase II
New Construction - 40,896 SF
Post-Bid
$8,180,000 est. value
Austin, TX 78721

H.B. Zachry Middle School Magnet Addition/Renovation
Renovation, Addition
Results
$7,500,000 est. value
San Antonio, TX 78250

Frisco High School #12
Construction
Frisco, TX 75035

Fort Worth Academy Middle School
Renovation, Addition - 19,410 SF
Construction
$2,700,000 est. value
Fort Worth, TX 76132

Wedgwood Middle School
Renovation
Conception
$62,213,434 est. value
Fort Worth, TX 76133

Ground Up Construction Projects
Post-Bid
Austin, Fort Worth, Houston, San Antonio, TX

New Argyle Administration Building
New Construction
Construction
$4,890,554 est. value
Argyle, TX 76226

Hobby Middle School Magnet Facilities
Addition
Conception
$24,800,000 est. value
San Antonio, TX 78230

Calvert ISD 2021 Bond Project
Renovation, Addition
Post-Bid
Calvert, TX

Athletic Upgrades at Coke R Stevenson Middle School
Construction
Less than $9,500,000 est. value
San Antonio, TX

Last Updated 06/20/2022 09:04 AM
Project Title

Lincoln Middle School Auditorium Renovations Project

Physical Address View project details and contacts
City, State (County) Port Arthur, TX 77640   (Jefferson County)
Category(s) Education, Entertainment/Recreation
Sub-Category(s) Middle/Senior High School, Theaters/Auditoriums
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,304,243
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work for the Lincoln Middle School Auditorium Renovations Project Project includes (and as more specifically set out in the Project Manual): Renovations and Repairs to Lincoln Middle School Auditorium. The estimated budget for HVAC is $960,000.00 and the estimated budget for the remainder of the project is $2,304,243.00.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Foodservice Equipment, Audio-Visual Equipment, Projection Screens, Projectors, Broadcast, Theater, and Stage Equipment, Recreational Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating.
Division 13 - Special Construction, Sound, Vibration, and Seismic Control.
Division 21 - Fire Suppression, Fire Suppression Systems Insulation.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Theatrical Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems.
Division 28 - Electronic Safety and Security, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents