Similar Projects
Widen and Resurface - SH 48
Infrastructure
Design
$11,000,000 CJ est. value
Wapanucka, OK 73461

Widen and Resurface - SH 48
Infrastructure
Design
$11,000,000 CJ est. value
Wapanucka, OK 73461

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Slabjacking and Subsealing Services
Infrastructure
Results

Utilities
Infrastructure
Design
$932,931 CJ est. value
Tishomingo, OK 73460

ODOT Water Line Relocation
Infrastructure
Post-Bid
$400,000 CJ est. value
Wapanucka, OK 73461

Widen and Resurface - SH 78
Infrastructure
Design
$10,400,000 CJ est. value
Milburn, OK 73450

Renovation / Addition Project for the Middle/High School
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Tishomingo, OK 73460

Bridge Rehabilitation - SH 48
Infrastructure
Design
$1,350,000 CJ est. value
Wapanucka, OK 73461

Construction of a New Parking Area and Canopy
Infrastructure
Post-Bid
$100,000 CJ est. value
Tishomingo, OK 73460

Utilities - SH 7
Infrastructure
Design
$500,000 CJ est. value
Tishomingo, OK 73460

Right of Way - SH007
Infrastructure
Design
$1,500,000 CJ est. value
Coleman, OK 73432

Last Updated 04/23/2023 03:01 PM
Project Title

Resurface - SH 1

Physical Address View project details and contacts
City, State (County) Mill Creek, OK 74856   (Johnston County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,994,136 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Resurface (Asphalt) Sh-1: From the Sh-199 Junction, Extend Northeast Near mannsville. Project Length = 7.560 Miles Counties: Johnston, Marshall Submit any questions or concerns to the Office Engineer Division via: - Email: ODOT-Prebid.Question@odot.org - Phone: (405) 521 - 2625 Please include the words " Pre-bid question(s)" along with the call order and the bid opening date of the project in question in the subject line of the correspondence. Unless otherwise specified in the proposal, all bids must be submitted with a proposal guaranty equal to 5% of the bid total. Bids submitted electronically must have their bid bonds verified electronically through the electronic bidding system. Written bids must have their bond stapled to the back of the proposal. In lieu of a bid bond, a certified/cashier's check made payable to the Oklahoma Department of Transportation may be submitted as a proposal guaranty. Checks must be delivered to Office Engineer Division prior to the bid opening. Proposal checks will be held or returned by the Department as per Subsection 103.04 of the State Standard Specifications. OKDOT - 327 - Resurface - SH 1

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents