Similar Projects
Guardian Self Storage
New Construction - 119,300 SF
Conception
$8,000,000 to $10,000,000 est. value
Fort Collins, CO 80525

Sanders Business Park at Castle Rock
New Construction
Conception
Castle Rock, CO 80104

CNG Fueling Station Storage and Office Building
New Construction - 6,100 SF
Design
$350,000 to $450,000 est. value
Fort Lupton, CO 80621

The Business Center at CTC
New Construction - 83,615 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Louisville, CO

Swansea Recreation Center Indoor Pool CM and GC
Renovation, Addition
Bidding
$15,000,000 est. value
Denver, CO 80216

13 Sheds delivered to various locations across CO
New Construction
Bidding
Denver, CO

New Retail Building
New Construction - 8,101 SF
Post-Bid
Thornton, CO 80023

Westcliffe Sand Shed Repairs
Post-Bid
Rosita, CO 81252

Transit Campus Expansion Bus Storage Construction
New Construction - 71,218 SF
Results
$7,000,000 to $13,000,000 est. value
Colorado Springs, CO 80903

CLRD Fort Collins Admin Storage Building
New Construction
Results
$25,000 to $50,000 est. value
Fort Collins, CO 80524

U-Haul Valley Hi
New Construction, Renovation - 85,000 SF
Construction
$7,324,770 est. value
Colorado Springs, CO 80910

Advantage Storage
New Construction - 13,100 SF
Construction
Arvada, CO 80007

Noco RV Rentals
New Construction
Pending Verification
$2,000,000 est. value
Fort Collins, CO 80524

Centerra Industrial Heavy Logistics Centers
New Construction - 3,951,408 SF
Pending Verification
$10,000,000 CJ est. value
Loveland, CO

Auto Trends
Addition - 4,750 SF
Conception
Fort Collins, CO 80524

Reported 01/11/2022 12:00 AM
Project Title

Public Works Facility 1B Project

Physical Address View project details and contacts
City, State (County) Basalt, CO 81621   (Pitkin County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 10/28/21
Owner View project details and contacts
Architect View project details and contacts
Description

The building is proposed to be a single-story pre-engineered steel building, approximately 40’-0” x 100’-0” of unconditioned space, which will be designed by the building manufacturer. This project is Phase 1B of the Public Works Facility development plan and includes the building of a new pre-engineered steel building and perimeter fence. The site work that is associated with the new Public Works Facility is being completed under a separate contract is referred to as Phase 1A and was awarded earlier this summer. The drawings and specifications included in this bid package for Phase 1B are intended to guide the bidder in their selection of a pre-engineered steel building.

Details

Warehouse/Storage, 1 Story Above Grade, 4,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment, Parking Control Equipment.
Division 22 - Plumbing.
Division 26 - Electrical.
Division 32 - Exterior Improvements, Rigid Paving.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents