Similar Projects
Access Control Point Program Design Build II -- RFI(2)
Design

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Operation and Maintenance of Government-Owned Facilities and Equipment, Jim Woodruff Lock & Dam and Lake Seminole Project, Florida and Georgia
Bidding

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

Marion County Public Safety Communications Bunkhouse
New Construction
Post-Bid
Ocala, FL 34475

Back-Up EOC + 911 Communications Center Interior Basement Remodel
Post-Bid
Ocala, FL

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

Marion County Sheriff's Forensic Building
New Construction - 35,127 SF
Construction
Ocala, FL 34475

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

Indefinite Quantity Construction Contract - East Central and Southwest Florida
Results
$2,000,000 est. value

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Design
$250,000 to $5,000,000 est. value

Public Defenders Building
Post-Bid
Ocala, FL 34475

Z--Design-Build and Design-Bid-Build Indefinite-Delivery/Indefinite Quantity, Firm-Fixed Price, Roofing Multiple Award Construction Contract for the Florida Panhandle Area of Operation
Results
$150,000 to $6,000,000 est. value

Last Updated 11/20/2019 03:26 PM
Project Title

Marion County Health Department Remodel

Physical Address View project details and contacts
City, State (County) Ocala, FL 34471   (Marion County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

1. All work shall be executed in accordance with all governing national, state and local codes and regulations. 2. All building elements shall be installed vertically w/no horizontal joints. 3. Due to material tolerances the general contractor must verify all dimensions with actual conditions on the site and report any differences to the architect for interpretation and resolution prior to commencement of work. 4. Provide cont. blocking consisting of P.T. 1x8 min. at 2x8 min. blocking at frame wall typ. in restrooms to receive plumbing fixtures, grab bars accessories, cabinets, door casings, crown molding, etc. 5. Repaint existing ceiling repair & patch as required. Ceiling paint shall be Sherman Williams interior super paint "flat" finish over manufacturers approved gyp. bd. primer. 6. Repaint existing walls repair & patch s required. Wall paint shall be Sherman Williams interior super paint "semi gloss" finish over manufacturers approved gyp. bd. primer. 7. Women's R/R existing soffit light to be replaced with 2-48" long LED lights, match temperature of existing lights. 8. Men's R/R existing soffit light to be replaced with 1-48" long LED light, match temperature of existing lights.

Details

Division 02 - Existing Conditions, Demolition.
Division 09 - Finishes, Flooring.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents