Similar Projects
Tri-Ven Facility
Addition, Infrastructure - 50,000 SF
Conception
Baxter, MN 56425

Warehouse Building Storage & Parking
New Construction - 63,272 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Rosemount, MN 55068

Mickelson Invesments Building
New Construction - 12,700 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Clearwater, MN

Amazon Logistics Center
Build-Out
Design
Eagan, Saint Paul, MN 55121

Daikin Control Room Heat Transfer Test Cell
Renovation
Post-Bid
Minneapolis, MN 55441

NSC Loading Dock Replacement
Results
$150,000 est. value
West Saint Paul, MN 55118

Nordic Ware Manufacturing Warehouse
Addition - 45,000 SF
Construction
Saint Louis Park, MN 55416

Gateway Interstate
New Construction
Construction
Arden Hills, MN 55112

Hillcrest Golf Course Redevelopment
New Construction
Pending Verification
Saint Paul, MN

Graco, Inc
New Construction - 500,000 SF
Pending Verification
$10,000,000 CJ est. value
Dayton, MN 55327

4Front Office And Industrial Area Expansion
Addition, Infrastructure - 310,000 SF
Conception
Oakdale, MN

610 Junction Business Park
New Construction - 511,500 SF
Design
$10,000,000 CJ est. value
Osseo, MN 55369

Chaska Creek Industrial Warehouse
New Construction - 133,000 SF
Construction
$10,000,000 CJ est. value
Chaska, MN 55318

Huber Engineered Woods Processing Plant
New Construction
Pending Verification
$440,000,000 est. value
Cohasset, MN

Quality One Woodwork Expansion
Addition - 50,000 SF
Pending Verification
Hastings, MN 55033

Last Updated 09/03/2021 02:22 PM
Project Title

River Valley Industrial Development

Physical Address View project details and contacts
City, State (County) Chaska, MN 55318   (Carver County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Manufacturing/Processing Plant
Contracting Method
Project Status Obtained from a Public Office
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New multitenant industrial building at the River Valley Industrial Center

Details

Industrial Warehouse, New Construction, Manufacturing/Processing Plant, 84,000 SF New Construction, 21 Acres.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents