Similar Projects
Riverside Drive Stormwater Mitigation Project
Infrastructure
Bidding
$400,000 est. value
Atlanta, GA 30328

T32-D6 Sweeping and Drain Cleaning
Term Contract
Bidding
Atlanta, GA

Combined Sewer Replacement
Post-Bid
Atlanta, GA

Storm Drain Lining
Infrastructure
Post-Bid
Fairburn, GA

Citywide Stormwater Improvements
Results
Less than $329,231 est. value
Union City, GA 30291

Peachtree Dunwoody at Telford Place Roadway Improvement Project
Results
Sandy Springs, GA 30328

Green Infrastructure Outdoor Activity Center
Infrastructure
Bidding
$700,000 est. value
Atlanta, GA

Asphalt Trail and Drainage Projects
Infrastructure
Post-Bid
Milton, GA

Interstate North Parkway TS170
Results
Sandy Springs, GA

Global Impact Academy - Storm Drainage Improvement
Infrastructure
Bidding
$800,000 est. value
Fairburn, GA 30213

Tommy Lee Cook Road and Alpine Way Storm Drain Replacement project
Infrastructure
Post-Bid
$700,000 est. value
Palmetto, GA

11045 Bolster Court Storm Pipe Replacement
Results
GA 30024

260-270 Drummen Court Drainage Improvement and Maintenance
Infrastructure
Bidding
$700,000 est. value
Atlanta, GA 30328

Stacks Road over CSX Railroad - Abutment Wall Repairs and Roadway Drainage Improvements
Results
College Park, GA 30349

Hapeville CDBG Park Improvements
New Construction
Results
Hapeville, GA 30354

Last Updated 06/01/2022 03:06 AM
Project Title

290 Batesville Road Stormwater Project

Physical Address View project details and contacts
City, State (County) Milton, GA 30004   (Fulton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Alpharetta, Georgia. Completed plans call for site work for a water / sewer project.The Successful Bidder shall be required to furnish PAYMENT AND PERFORMANCE BONDS for the faithful performance on the contract and a bond to secure payment of all claims for materials furnished and/or labor performed in performance of the project, both in amounts equal to one hundred percent (100%) of the base bid price. The Successful Bidder shall also be required to furnish a MAINTENANCE BOND, in the amount of one-third (1/3) of the contract price, guaranteeing the repair or replacement caused by defective workmanship or materials for a period of two (2) years from the completion of construction. Questions must be also be submitted online in the same manner listed above for bids. Deadline for questions is May 16, 2022 at 5:00 p.m Tentative Contract Award (on/about) June 20, 2022 The City reserves the right to reject any and all bids, to waive technicalities, and to make an award as deemed in its best interest. It is understood that all bids are made subject to this Agreement, that the City reserves the right to award the bid to the lowest, responsible Bidder, and in arriving at this decision, full consideration will be given to the reputation of the Bidder, his financial responsibility, and work of this type successfully completed. removal, constructing an earthen berm, and new four-board wooden fence installation only along the construction area. All work will be according to the plan and any field adjustments must be approved by the Inspector prior to construction.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents