Similar Projects
Mid America Commerce Center
New Construction, Infrastructure
Conception
$80,000,000 CJ est. value
Belleville, IL 62269

Central Park - Lot 1
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
O Fallon, IL 62269

Hampton Manor of St. Clair County
New Construction, Infrastructure - 66,481 SF
Design
$18,000,000 CJ est. value
O Fallon, IL 62269

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

St. Clair County MetroLink Extension
Infrastructure
Bidding
$200,000 CJ est. value
Mascoutah, IL 62258

Water Main Improvements
Infrastructure
Post-Bid

Caseyville Township East Plant Terminal Lift Station Crane
Renovation
Post-Bid
IL

2021 Water Main Replacement Program
Infrastructure
Results
O Fallon, IL 62269

Lift Station Rehabilitation PY20
New Construction
Results
$600,000 est. value
Alorton, IL 62207

Brandywine Garden Villas
New Construction, Infrastructure - 62,622 SF
Pending Verification
$75,000,000 CJ est. value
O Fallon, IL 62269

West Presidential Streets Phase 2 - City Of O'Fallon
Infrastructure
Pending Verification
$1,500,000 CJ est. value
O Fallon, IL 62269

Christian Brothers Automotive Repair And Service Shop
New Construction, Infrastructure - 5,133 SF
Design
$1,200,000 CJ est. value
O Fallon, IL 62269

Parking and Site Improvements AMP 2
Infrastructure
Bidding
$300,000 CJ est. value
Belleville, IL 62220

Mascoutah Route 4 Water Main Extension Phase I
Infrastructure
Post-Bid
Mascoutah, IL

Lift Station Rehabilitation PY20
Renovation
Results
East Saint Louis, IL 62205

Last Updated 12/08/2022 08:13 AM
Project Title

Distribution System Water Quality improvements

Physical Address View project details and contacts
City, State (County) O Fallon, IL 62269   (Saint Clair County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $928,862 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Furnishing all labor, materials, and equipment required to construct liquid sodium hypochlorite feed systems in prefabricated FRP enclosures at the Public Works Booster Station, Kyle Road Elevated Tank, and Seven Hills Elevated Tank as well as two control valve additions in concrete vaults in the distribution system and associated piping and other appurtenances in accordance with the specifications and plans covering the work. Bidders must secure their information as to the condition of the site and all local conditions affecting the work prior to submitting their proposals. Bidders are notified that the price bid must include everything as described in the specifications and shown on the drawings. No extra of any kind will be allowed unless ordered in writing by the Owner. The Construction Contract for this project is subject to "An Act regulating wages of laborers, mechanics and other workers employed in any public works by the State, County, City or any public body or any political subdivision or by anyone under contract for public works", approved June 26, 1941, as amended, being Section 820 ILCS 130/1-12 Illinois Compiled Statutes, commonly referred to as The Prevailing Wage Act. The Construction Contract for this project is also subject to the Employment of Illinois Workers on Public Works Act (30 ILCS 570). The Construction Contract for this project is also subject to the Illinois Works Jobs Program Act, 30 ILCS 559/Art. 20 Illinois Works Apprenticeship Initiative. Any contract awarded under this Invitation for Bids will require performance and payment bonds in the amount of 100% of the contract price. The contract will be awarded to the lowest responsive, responsible bidder. All questions shall be directed to Brian Buchheit at HMG Engineers, Inc. at bbuchheit@hmgengineers.com. The OWNER may make such investigations as he deems necessary to determine the ability of the BIDDER to perform the WORK, and the BIDDER shall furnish to the OWNER all such information and data for this purpose as the OWNER may request. The OWNER reserves the right to reject any BID if the evidence submitted by, or investigation of, such BIDDER fails to satisfy the OWNER that such BIDDER is properly qualified to carry out the obligations of the Agreement and to complete the WORK contemplated therein. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents