Similar Projects
Elementary Auxiliary Gym and Classroom Expansion
Addition - 15,000 SF
Design
Herriman, UT

Herriman Elementary
Renovation
Design
$2,100,000 est. value
Herriman, UT 84096

Bell View Elementary Remodel
Renovation
Bidding
Sandy, UT 84070

Granite Elementary Front Line Upgrade
Renovation
Bidding
Sandy, UT 84092

Oakdale Elementary Office Remodel
Post-Bid
Sandy, UT 84093

Hidden Oaks Elementary School
New Construction - 76,282 SF
Post-Bid
Herriman, UT

Kennedy Jr. Remodel of Former Seminary Building
Renovation
Results
$200,000 to $250,000 est. value
West Valley City, UT 84120

Replacements for White City Area Elementary School on Edgemont Property and Peruvian Park Elementary
Results
Granite, Sandy, UT 84070

CSD Glacier Hills Elementary School
Construction
Less than $25,000,000 est. value
Sandy, UT 84094

Frost Elementary Security Remodel
Addition - 600 SF
Construction
Salt Lake City, West Valley City, UT 84119

Draper Elementary School Front Line Upgrade
Renovation
Bidding
Draper, UT 84020

Oquirrh Elementary Dishroom Remodel
Renovation
Post-Bid
West Jordan, UT 84084

New Herriman Elementary 7 - Part 2
Results
Herriman, UT 84096

Stage Remodel at Southland Elementary
Renovation
Post-Bid
Riverton, UT 84065

Miscellaneous Remodels - Terra Linda Elementary
Renovation
Results
West Jordan, UT 84088

Reported 02/23/2022 12:00 AM
Project Title

Building and Facility Expansion for Providence Hall Charter School

Physical Address View project details and contacts
City, State (County) Herriman, UT 84096   (Salt Lake County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This expansion will require construction of a new building that will sit directly behind the elementary school. It will add 2 kindergarten classes, and 3 additional grade levels, 1st, 2nd, and 3rd. It will have a total of 11 new classrooms, 1 weight room, a boardroom, an IT office, 3 school level offices, a PE storage and office, a full regulation size gym with 6 basketball hoops and 3 volleyball net systems, a faculty lounge, and storage. The building will bring the existing student count from 800 to 900 total students. The facility to be built is designed in such a way as to accommodate the needs of this student population and teaching program. Additionally, the project will include a playing field surrounding the building, new parking area for the school, as well as a pull around lane for pickup and drop off that will wrap around the rear of the building.

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents