Similar Projects
Banner Gilbert Medical Center Parking Lots
Design
Gilbert, AZ 85234

Buckeye Pool & Parking Expansion
New Construction - 19,000 SF
Design
$1,450,000 est. value
Buckeye, AZ 85326

System Preservation - Rest Area Rehabilitation
Infrastructure
Bidding
AZ

System Preservation
Infrastructure
Bidding
$24,800,000 est. value
Buckeye, AZ

Construction Manager at Risk Broadway Road (Phase 1) - Mesa Drive to Stapley Drive
Post-Bid
$25,000,000 to $30,000,000 est. value
Mesa, AZ 85210

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

Phoenix-Casa Grande Highway (I-10) 1-17 (Split) to SR 202L (Santan)
Results
Chandler, AZ 85225

Sun City Festival Ranch Planning Area 2 Parcel C2 Paving
Results
Buckeye, AZ 85326

CarMax - Parking Lot
New Construction
Construction
Gilbert, AZ 85297

Riverpoint Parking Lot Addition
Addition
Construction
Phoenix, AZ 85040

Signal Butte Road - Williams Field Road to Germann Road
Infrastructure
Bidding
$13,500,000 to $15,500,000 est. value
Mesa, AZ 85212

Right-of-Way General Construction
Post-Bid
Phoenix, AZ 85003

New Facilities (Construction of New Roads)
Results
Less than $2,192,000 est. value
Maricopa, AZ 85138

Cave Creek Road To 26Th Street And Angela Drive To Marco Polo Road - Design Bid Build
Infrastructure
Bidding
Phoenix, AZ

Intersection Improvement Services Job Order Contract
Post-Bid
$5,000,000 est. value
Phoenix, AZ 85003

Last Updated 08/19/2021 04:57 PM
Project Title

Pinnacle Peak Road 45th Avenue to 35th Avenue Paving and Storm Drain Improvements

Physical Address View project details and contacts
City, State (County) Glendale, AZ 85310   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,000,722
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pinnacle Peak Road: 45th Avenue to 35th Avenue project consists of constructing new roadway paving and storm drain improvements on Pinnacle Peak Road from 45th Avenue to just west of 35th Avenue, and constructing a new storm drain on 43rd Avenue extending north from Pinnacle Peak Road to Misty Willow Lane. The work includes: subgrade preparation and constructing new asphaltic concrete roadway pavement; new concrete curb and gutter, ADA compliant concrete sidewalk, curb returns, concrete driveway entrances; new concrete box culvert crossings, concrete wing walls, concrete headwalls with brick veneer facing, concrete channel lining, new storm drain mainline pipe, storm drain manholes, storm drain connector pipes and catch basins; trenching for underground street light circuits; installation of new traffic signal poles, signal equipment, and traffic signal conduits; installation of new LED street lights and LED luminaires; new landscaping and irrigation system, decomposed granite landscape ground cover; and other required work items. P

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents