Similar Projects
Guardrail, Guardrail Anchor, and Guardrail Ending Upgrades on Various Primary Routes
Bidding
NC

Guardrail and Guardrail Ending Upgrades on NC-226 from US-19E to NC-261
Bidding
NC

Design-Build Signage and Wayfinding Development
Post-Bid
Morehead City, NC 28557

Traffic Sign Blanks
Post-Bid
Asheville, NC

Installation of Wayfinding Signs and Posts
Results
Jacksonville, NC

Durham Convention Center Exterior Signage and Canopy
Results
Durham, NC 27701

Treated Posts (Div 2 - Greenville Traffic Services)
Bidding
Greenville, NC 27834

Park Identification Sign Fabrication and Installation
Post-Bid
Asheville, NC 28802

Crooked Creek WWTP Entry Sign and Landscaping
Results
Monroe, NC

Remove and Replace Various Sections of Guardrail Along US 74
Bidding
NC

Command Signs (Proj. 20-0429)
Post-Bid
$100,000 to $250,000 est. value
Camp Lejeune, NC 28547

Road Signs
Results
Jacksonville, NC 28541

Pavement Marking
Term Contract
Bidding
Raleigh, NC

Welcome to Goldsboro Sign Maintenance
Term Contract
Post-Bid
Goldsboro, NC 27530

Furnish, Deliver, and Install NCWorks Career Center Signs
Results
Aberdeen, Ahoskie, Albemarle, Asheboro, Burlington, Chapel Hill, Clayton, Clinton, Concord, Dunn, Durham, Edenton, Elizabethtown, Fayetteville, Greensboro, Henderson, High Point, Kenansville, Kinston, Lillington, Lincolnton, Monroe, Mooresville, Morehead City, Mount Airy, Nags Head, Nebo, New Bern, Oxford, Pittsboro, Raeford, Raleigh, Reidsville, Roanoke Rapids, Salisbury, Sanford, Shallotte, Statesville, Troy, Wadesboro, Warrenton, Washington, Whiteville, Williamston, Winston-Salem, NC 27215

Last Updated 03/25/2020 04:54 AM
Project Title

Annual Needs Sign Installation and Repair

Physical Address View project details and contacts
City, State (County) (Edgecombe, Halifax, Johnston, Nash, Wayne, Wilson Counties)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1 902 Reinforced Concrete Sign Foundations 25 Cy 2 902 Plain Concrete Sign Foundations 5 Cy 3 903 Supports, Breakaway Steel Beam 20000 Lb 4 903 Supports, Simple Steel Beam 2500 Lb 5 903 Supports, 3-Lb Steel u-Channel 250 Lf 6 903 Supports, 2-Lb Steel u-Channel 25 Ea 7 903 Supports, Wood (4” x 6”) 40 Lf 8 903 Supports, Wood (6” x 6”) 40 Lf 9 903 Supports, Wood (6” x 8”) 40 Lf 10 903 Supports, Wood (8” x 8”) 40 Lf 11 904 Sign Erection, Type a (Overhead) 10 Ea 12 904 Sign Erection, Type b (Overhead) 5 Ea 13 904 Sign Erection, Type a (Ground Mounted) 20 Ea 14 904 Sign Erection, Type b (Ground Mounted) 5 Ea 15 904 Sign Erection, Overlay (Overhead) 5 Ea 16 904 Sign Erection, Overlay (Ground Mounted) 5 Ea 17 904 Sign Erection, Relocate, Type a (Ground Mounted) 5 Ea 18 904 Sign Erection, Relocate, Type b (Ground Mounted) 5 Ea 19 904 Type d,e,f (Ground Mounted) 5 Ea 20 904 Sign Erection, Type d 10 Ea 21 904 Sign Erection, Type e 20 Ea 22 904 Sign Erection, Type f 15 Ea 23 904 Sign Erection, Logo To Panel 100 Ea 24 904 Sign Erection, Logo Trailblazer 25 Ea 25 907 Disposal Of Sign, a Or b (Ground Mounted) 10 Ea 26 907 Disposal Of Sign, a Or b (Overhead) 3 Ea 27 907 Disposal Of Sign, Type d, e, f, Or Logo 5 Ea 28 907 Disposal Of Support, Steel Beam 10 Ea 29 907 Disposal Of Support, u-Channel 5 Ea 30 907 Disposal Of Support, Wood 15 Ea 31 907 Disposal Of Sign System, Steelbeam 10 Ea 32 907 Disposal Of Sign System, Uchannel 5 Ea 33 907 Disposal Of Sign System, Wood 20 Ea 34 907 Stockpile Sign, a Or b (Overhead) 3 Ea 35 907 Stockpile Sign, a Or b (Ground Mounted) 3 Ea 36 907 Stockpile Sign, Type d, e, f, Or Logo 3 Ea 37 Sp Emergency Mobilization 10 Ea 38 Sp Traffic Control: Two-Lane 25 Ea 39 Sp Traffic Control: Multi-Lane 25 Ea 40 Sp Traffic Control: Shoulder-Closure 25 Ea 41 Sp Labor Hours To Correct Type a and b Signs 50 Hrs 42 Sp Night-Time Mobilization 10 Ea 43 Sp Minor Limbing 50 Hrs 44 Sp Removal Of Existing Concrete Footing 5 Ea 45 Sp Hole Formation 10 Ea

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control.
Division 10 - Specialties, Signage.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents