Similar Projects
Improvements to Haig Avenue, Petain Avenue, and Firehouse Monument Foundation
Infrastructure
Bidding
Milltown, NJ

2022 Roadway Improvements Plans Justice Street
Infrastructure
Bidding
Piscataway, NJ 08854

Completion of Bonded Improvements
Post-Bid
Monmouth Junction, NJ 08852

2020 CDBG Road Reconstruction Program
Post-Bid
Old Bridge, NJ

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Road Maintenance Program XIII
Results
Plainsboro, NJ 08536

Interstate 295 Miscellaneous Roadway Improvements
Infrastructure
Bidding

2020 CDBG Road Reconstruction Program
Post-Bid
Old Bridge, NJ

Roadway Resurfacing Milepost 0 to 122; (2020)
Results
$880,000 est. value

Maintenance Resurfacing Contract No. 524
Infrastructure
Bidding
$5,000,001 to $10,000,000 est. value

Riva Avenue Overlay
Post-Bid
East Brunswick, NJ 08816

Milling and Paving of William Warren Park
Results
Woodbridge, NJ 07095

Roadway Millling Service Requirements as Required
Infrastructure
Bidding
New Brunswick, NJ

Edgeboro Road Improvements
Post-Bid
$1,300,000 est. value
East Brunswick, NJ 08816

Brickyard Road Phase 1 Improvement Project (Route 130 to Hightstown-Cranbury Station Road)
Results
Cranbury, NJ 08512

Reported 03/16/2022 12:00 AM
Project Title

2020 Roadway Paving and Reconstruction Project - Phase III

Physical Address View project details and contacts
City, State (County) Sayreville, NJ   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of concrete, roadway paving / reconstruction and utility improvements to Avon Way and Stradford Road located within the Borough of Sayreville. The work involved with these improvements includes the maintenance and protection of traffic; cutting and removal of existing trees, installation of new street trees; installation of approximately 300 lineal feet +/- of 12" diameter PPT underdrain; installation of approximately 120 lineal feet +/- of 12" diameter RCP Class V storm sewer pipe reaches; construction of approximately 6 +/- new inlet structures; reconstruction of approximately 6 +/- existing storm sewer inlet structures of various types; extending existing roof leader drains to new curb; furnishing and installation of new fire hydrant assembly, removal and replacement of existing fire hydrant including connection to existing pipe runout and all appurtenances; removal / replacement of approximately 30 +/- of existing water service curb boxes; resetting of existing utility manhole castings and water main / hydrant valve boxes; removal of approximately 3,700 lineal feet +/- of existing concrete curb and monolithic concrete curb / gutter; removal of approximately 16,000 square feet +/- of various types of concrete sidewalks, driveways and/or aprons; construction of approximately 3,700 lineal feet +/- of new standard Borough concrete curb, approximately 120 lineal feet +/- of new standard County concrete curb, approximately 12,000 square feet +/- of new standard Borough concrete sidewalk; approximately 500 square feet +/- of new standard County concrete sidewalk and approximately 4,000 square feet +/- of new standard Borough reinforced concrete driveways and aprons; furnishing / installation of cast-in-place handicapped sidewalk ramp delineation; restoration of hot mix asphalt driveways; cutting / removal of approximately 7,500 square yards +/- of existing roadway asphalt pavement; installation of dense graded aggregate base course, if and where ordered; installation of approximately 2,700 tons +/- of hot mix asphalt base course material; resurfacing the entire roadways with approximately 800 tons +/- of hot mix asphalt surface course material; application of approximately 1,000 lineal feet +/- of traffic pavement stripes / markings (4" wide lines); application of fire hydrant pavement markings (symbols); furnishing / installation of topsoil and sod; right-of-way / property restoration; and all other preparation, restoration and associated work in accordance with the Contract Documents.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents