Similar Projects
Fire Suppression System Monitoring & Maintenance, Phoenix Az
Design
Phoenix, AZ

Fire Alarm System Upgrade Project at Willcox Middle School
Bidding
Willcox, AZ 85643

Flowing Wells High School Fire Alarm
Bidding
Tucson, AZ 85705

Fire and Emergency Services
Term Contract
Post-Bid
Coolidge, AZ 85128

Z--Buenos Aires Fire Sprinkler Installation
Post-Bid
$43,000,000 to $63,000,000 est. value
Sasabe, AZ

Fy 19 Fire Protection Survey
Results
Nogales, AZ 85621

Fira Alarm System Maintenance Services
Term Contract
Results
Chinle, AZ 86503

Fire Suppression Inspection Services and Preventative Maintenance
Bidding
Casa Grande, AZ 85122

Organ Pipe Cactus National Monument (ORPI) Require
Post-Bid
$25,000 to $100,000 est. value
Ajo, AZ

Fire Alarm System
Results
Pinon, AZ

N--Fire Alarm System Repair
Bidding
Tuba City, AZ

CRUHSD - Fire Alarm Panel Replacement
Post-Bid
Bullhead City, AZ 86442

Fire Alarm System Replacement, Maintenance and Repair Services
Results
Phoenix, AZ

63--Fire Damper Annual Inspection, Test Schedule, Diag
Bidding
Kaibito, AZ

BCESD - Fire Alarm Panel Replacements
Post-Bid
Bullhead City, AZ 86442

Last Updated 10/08/2020 07:33 AM
Project Title

Fire Protection Upgrades - Mass Notification

Physical Address View project details and contacts
City, State (County) Yuma, AZ   (Yuma County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work requirement includes: • Removing and disposing of existing fire alarm systems, and wide area mass notification system. • Installing new addressable fire alarm control systems, mass notification systems, and wide area mass notification system. • Removing and disposing of existing Halon 130I fire suppression systems. • Removing and replacing all fire smoke dampers in the Administration building. • Installing new clean agent systems, including room integrity upgrades. • Modifying existing sprinkler systems: a. Installing supervised valves and flow switches (where needed). b. Installing insulation for exterior piping. c. Abandoning hose stations located within water processing area. • Patching and painting of walls and ceilings disturbed by this project.

Details

Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents