Similar Projects
Blatnik Bridge Replacement - Minnesota Department of Transportation
Demolition, New Construction, Infrastructure
Conception
$3,000,000,000 CJ est. value
Duluth, MN 55802

Railroad Street - Canal Park Drive to 5th Avenue West - City of Duluth
Infrastructure
Conception
$2,100,000 CJ est. value
Duluth, MN 55802

333 Tower Mixed-Use
New Construction, Infrastructure - 20,000 SF
Design
$75,000,000 CJ est. value
Duluth, MN 55802

Clure Public Marine Terminal - Duluth Seaway Port Authority
Infrastructure
Design
$10,500,000 CJ est. value
Duluth, MN 55802

Hermantown New District Office
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Hermantown, MN 55811

Maintenance Dredging in Duluth Harbor
Infrastructure
Bidding
$5,000,000 CJ est. value
Duluth, MN 55802

Trailhead Parking Lot
Infrastructure
Post-Bid
$280,000 CJ est. value
Tower, MN 55790

Asbestos Abatement and Tank Removal
Term Contract, Infrastructure
Post-Bid
$100,000 CJ est. value
Hermantown, MN 55811

Household Hazardous Waste Site Grading and Pavement Improvements
Infrastructure
Results
Duluth, MN

Mesabi Trail: Mckinley to Biwabik Segment 1
Infrastructure
Results
$800,000 est. value
MN

Hangar 101 Demolition and Development - Phase 1
Demolition, Renovation, Infrastructure
Construction
$388,236 CJ est. value
Duluth, MN 55811

Public Works Campus - St. Louis County
New Construction, Infrastructure
Construction
$8,000,000 CJ est. value
Tower, MN 55790

Planet Fitness / Duluth
New Construction, Infrastructure - 22,300 SF
Pending Verification
$2,500,000 CJ est. value
Duluth, MN 55811

Twin Metals Processing Facility
New Construction, Infrastructure
Pending Verification
$3,000,000,000 CJ est. value
Ely, MN 55731

24th Avenue West, 3rd Street to 7th Street - City of Duluth
Infrastructure
Conception
$450,000 CJ est. value
Duluth, MN 55806

Last Updated 06/12/2023 07:35 AM
Project Title

Orr Airport Fuel System

Physical Address View project details and contacts
City, State (County) Orr, MN 55771   (Saint Louis County)
Category(s) Commercial, Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $656,567 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Removing existing fuel system, Installing new fuel system with concrete foundation and slab, 500 square feet of striping

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents