Similar Projects
Farmstone Meadows Residential Subdivision
New Construction, Infrastructure
Conception
$38,300,000 CJ est. value
Willow Springs, NC 27520

Crescent Mills
New Construction, Infrastructure
Conception
$326,600,000 CJ est. value
Smithfield, NC 27577

Clayton Village Center Mixed Use Development
New Construction, Infrastructure - 80,000 SF
Design
$25,000,000 CJ est. value
Clayton, NC 27520

Whitley Townes
New Construction, Infrastructure
Design
$32,200,000 CJ est. value
Smithfield, NC 27577

CDBG-I Sewer Rehabilitation/Replacement
Infrastructure
Bidding
$2,000,000 CJ est. value
Selma, NC 27576

CDBG-I Sewer Rehabilitation/Replacement
Infrastructure
Bidding
$2,000,000 CJ est. value
Selma, NC 27576

Johnston Recovery Services
New Construction, Infrastructure
Sub-Bidding
$3,500,000 CJ est. value
Clayton, NC 27520

Academy Sports + Outdoors / Selma
New Construction, Infrastructure
Sub-Bidding
$4,500,000 CJ est. value
Selma, NC 27576

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Dance Art Drive 4" Force Main Extension
Infrastructure
Results
NC

City Road Utility Improvements
Infrastructure
Results
$800,000 est. value
Clayton, NC 27520

NC 96 Four Oaks Economic Development Water Main Extension
Infrastructure
Construction
$1,724,038 CJ est. value
Smithfield, NC 27577

NC 96 Four Oaks Economic Development Water Main Extension
Infrastructure
Construction
$1,724,038 CJ est. value
Smithfield, NC 27577

Wilder's Market
Demolition, New Construction, Infrastructure - 4,500 SF
Pending Verification
$4,000,000 CJ est. value
Clayton, NC 27520

Last Updated 01/03/2024 12:05 PM
Project Title

Clayton Community Park

Physical Address View project details and contacts
City, State (County) Clayton, NC 27520   (Johnston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Park/Playground, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $3,706,576 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline - 12/01/2023 at 4:00 PM ET Questions or requests for clarifications shall be directed to Amanda Martinez at amartinez@withersravenel.com The Project includes the following Work: Construction of parking facilities, greenway trail, sports courts, and associated utility, storm water and electrical infrastructure as identified on the project drawings and specifications. Bids will be received for a single prime contract. Bids shall be on a unit price basis. Mailed bids shall be sent to the following address: Chris Gallant, Project Manager, Town of Clayton, Engineering Department, 111 East Second Street, Clayton, NC 27520. Hand-delivered bids shall be addressed to Chris Gallant, Project Manager, Town of Clayton, delivered to 111 East Second Street, Clayton, NC 27520. The Project has an expected duration of 273 days. 09220694.00, 2023-02-SP_CD Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Amanda Martinez - amartinez@withersravenel.com Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents