Similar Projects
Last Updated | 05/31/2019 01:53 PM |
Project Title | East Parking Deck, Infrastructure, and Improvements - CDC Roybal Campus, Atlanta, GA |
Physical Address | View project details and contacts |
City, State (County) | Atlanta, GA 30329 (DeKalb County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Misc. Buildings, Parking Garage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $100,000,000 to $150,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project includes, but is not limited to, design and construction of a parking deck and entry control point, improvements to the campus main entrance, site improvements, and infrastructure improvements to Roybal Campus of the Centers for Disease Control and Prevention (CDC). The new cast-in-place parking structure will be located at the eastern portion of the campus, contain approximately 1600 parking spaces, and be incorporated into a comprehensive multi-modal entry control point for campus personnel. Work includes but is not limited to relocation of major utilities including diesel fuel tanks, installation of an elevated pedestrian bridge, and photovoltaic parking shelter panels. Improvements will also be made to the campus main entrance. Work includes but is not limited to relocation of guardhouses, installation of vehicle barriers and inspection canopies, traffic flow revisions, and new directional signage. The campus main gate must maintain basic operational flow at all times. Campus-wide site improvements include, but are not limited to grade improvements in accordance with current accessibility guidance, development of a comprehensive wayfinding plan, and installation of wayfinding signage. Campus infrastructure improvements may include, but are not limited to, domestic water loop connection, generator house construction with associated support infrastructure, and an approximately 3 million gallon thermal chilled water storage tank with associated connections to the campus central utility plant. Remediation of hazardous materials may or may not be included in this project. | ||||||||||||||||||||||||||||||||||||||||
Details | 1 Parking Garage, New Construction 1600 Parking Spaces.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |