Similar Projects
HVAC Maintenance Services
Term Contract
Design
Annapolis, Baltimore, College Park, Laurel, Owings Mills, MD - Leesburg, Springfield, Warrenton, VA

HVAC and Mechanical Products
Term Contract
Post-Bid

Air Purification Systems
Post-Bid
Chatham, Pound, Victoria, VA 23936

HVAC Preventive Maintenance and On-Call Services
Term Contract
Results
Alexandria, VA 22310

Meadowlark Botanical Gardens Atrium Rooftop Equipment Replacement
Results
Less than $400,000 est. value
Vienna, VA 22182

Armstrong SF665DW Heater Replacement Parts
Post-Bid

HVAC Preventive Maintenance and On-Call Services
Term Contract
Results
Alexandria, Vienna, VA 22314

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Drinking Water Replacement Chiller
Alteration
Results
Fairfax, VA

Metro Hanger HVAC
Alteration
Post-Bid
Henrico, VA 23250

Mason Neck State Park Residence HVAC System Replacement
Alteration
Results
Lorton, VA 22079

Boiler Maintenance and Repair
Term Contract
Post-Bid

CT Building BAS Upgrades
Alteration
Results
Annandale, Fairfax, VA 22003

Mystaire Cyanoacrylate Fuming Chamber
Term Contract
Results
McLean, VA

CT Building BAS Upgrades
Alteration
Results
Annandale, VA 22003

Last Updated 04/19/2022 07:07 AM
Project Title

Automatic Temperature Control System Replacement - Fairhill Elementary School

Physical Address View project details and contacts
City, State (County) Fairfax, VA 22031   (Fairfax County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The system to be controlled under work of this section is basely comprised of the building HVAC system. The HVAC systems being controlled are Boilers, Chiller, Associated Pumps, Rooftop Air Handling units, Fan Coil Units. Unit Ventilators, Rooftop Units, and Exhaust Fans. These specifications define the manner and methods by which these controls function.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Chillers and Coolers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents