Similar Projects
Stellar Golden Glades
New Construction, Demolition
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

Kendall Executive Center Apartments
New Construction - 141,376 SF
Conception
$10,000,000 CJ est. value
Kendall, FL 33193

One Island Park
New Construction - 5,000 SF
Design
$10,000,000 CJ est. value
Miami Beach, FL

Indian Creek Apartments
New Construction, Renovation, Addition
Design
Miami Beach, FL

Wynwood Works
New Construction
Sub-Bidding
$31,343,376 est. value
Miami, FL 33127

Fairlawn Elementary School New Addition and Renovation
Renovation, Addition
Post-Bid
Miami, FL 33144

PHCD Vacant Unit Preparations
Post-Bid
$1,800,000 est. value
FL

Wynwood Development Project
Results
Miami, FL 33129

VCA/ADA Improvement to Common Areas and Laundry Rooms
Renovation
Results
Hialeah, FL 33010

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

Biscayne Shores
New Construction - 334,301 SF
Conception
$10,000,000 CJ est. value
Miami, FL

Century Towne Place
New Construction - 47,000 SF
Design
$10,000,000 CJ est. value
Doral, FL

PHCD Work-Order Contract 2021 - Central Area
Post-Bid
$2,175,000 est. value
Miami, FL 33125

Construction Management at Risk - Seminole Elementary School Renovations
Renovation
Results
Less than $2,256,719 est. value
Miami, FL 33144

Reported 12/30/2021 10:16 AM
Project Title

South Dixie Mixed-Use

Physical Address View project details and contacts
City, State (County) Palmetto Bay, FL 33157   (Miami-Dade County)
Category(s) Commercial, Education, Residential
Sub-Category(s) Apartments/Condominiums, Elementary School, Office, Pre-School/Daycare
Contracting Method Bids by Invitation.
Project Status Project Delayed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Office, Apartments/Condominiums, 144,855 SF New Construction, Building, Elementary School, Pre-School/Daycare.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents