Similar Projects
Traffic Management System Installation
Infrastructure
Conception
$800,000 CJ est. value
Tower, MN 55790

Clure Public Marine Terminal - Duluth Seaway Port Authority
Infrastructure
Design
$10,500,000 CJ est. value
Duluth, MN 55802

2022 King Road Lift Station
Renovation, Infrastructure
Bidding
$520,000 CJ est. value
Orr, MN 55771

2022 King Road Lift Station
Renovation, Infrastructure
Bidding
$520,000 CJ est. value
Orr, MN 55771

Forestry R2 NE Region Ground Site Preparation and Release
Post-Bid
Aitkin, Cloquet, Deer River, Hibbing, Littlefork, Tower, Two Harbors, MN

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Knowlton Creek Forcemain Rehabilitation Phase 1
Results
Duluth, MN 55802

Household Hazardous Waste Site Grading and Pavement Improvements
Infrastructure
Results
Duluth, MN

Hangar 101 Demolition and Development - Phase 1
Demolition, Renovation, Infrastructure
Construction
$388,236 CJ est. value
Duluth, MN 55811

Zentih Tiny Home Neighborhood
New Construction, Infrastructure - 19,250 SF
Pending Verification
Duluth, MN 55806

333 Tower Mixed-Use
New Construction, Infrastructure - 20,000 SF
Pending Verification
$75,000,000 CJ est. value
Duluth, MN 55802

Breitung McKinley Park Trail
Infrastructure
Bidding
$412,420 CJ est. value
Tower, MN 55790

Scientific Drilling Operations
Infrastructure
Post-Bid
Soudan, MN 55782

2021 Utility Extensions
Infrastructure
Results
MN

NorthMet Project
New Construction, Infrastructure
Pending Verification
$1,000,000,000 CJ est. value
Hoyt Lakes, MN 55750

Last Updated 09/08/2022 03:54 PM
Project Title

2022 Lead Water Service Replacement Project - Phase 1

Physical Address View project details and contacts
City, State (County) Duluth, MN 55802   (Saint Louis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $143,896 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION & MAJOR WORK ITEMS: This project will include the removal of existing lead water services while installing 11 new 1" HDPE service using a pulling method whenever possible. Additional excavation pits may be required to install HDPE water service. Back fill and restoration. This project is funded in whole or in part by the American Rescue Plan Act. Federal supplementary provisions shall apply. The awarded bidder must have an active SAM.gov registration with no exclusions. Questions pertaining to this project should be directed to: Tim Sanders, PE, Project Engineer, 218-730-5066, tsanders@duluthmn.gov Bid surety in an amount equal to five per cent (5%) of the total bid shall be submitted with each bid. Electronic bid surety can be submitted in Bid Express; bid bonds may also be emailed to purchasing@duluthmn.gov. Paper bid bonds, certified checks or bank drafts may be mailed or dropped off at Purchasing, City Hall Room 120, 411 West 1 st Street, Duluth, MN 55802. Regardless of the method of submission, bid bonds must be received by the City prior to the bid opening. Not less than prevailing wages as included in the specifications and provisions must be paid on this project. A Project Labor Agreement (PLA) and Community Benefits provisions will be required for any bid that is over or could virtually go over $150,000. The contractor must take affirmative action to ensure that the employees and applicants for employment are not discriminated against because of their race, color, creed, sex or national origin, and must meet the affirmative action goals. Contractors are encouraged to subcontract with Disadvantaged Business Enterprises when possible. Contractor will comply with all applicable Equal Employment Opportunity laws and regulations. The City of Duluth reserves the right to waive informalities and to reject any or all bids.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents