Similar Projects
Full Depth Pavement Removal and Replacement - Blaine Street
Infrastructure
Bidding
$963,000 CJ est. value
Cissna Park, IL 60924

Full Depth Pavement Removal and Replacement - Blaine Street
Infrastructure
Bidding
$963,000 CJ est. value
Cissna Park, IL 60924

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Bayles Lake HOA Hydropneumatic Storage Tank and Treatment Building
New Construction, Renovation, Alteration
Post-Bid
$400,000 est. value
Loda, IL

Bituminous Materials
Infrastructure
Results
Clifton, IL

A-1 Seal Coat
Infrastructure
Results
Buckley, IL

Roadway Widening
Infrastructure
Post-Bid
Sheldon, IL

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

Road Repair
Infrastructure
Post-Bid
Watseka, IL

US 52 - 3P Milling and Resurfacing, Shoulder Widening and ADA in Iroquois from East of IL 1 to South of Donovan in Iroquois County
Infrastructure
Results
IL

Intersection of IL 49 and IL 24 (l.m. 0.00) and Ending at the Vermilion County Line (L.M. 21.50)
Infrastructure
Post-Bid
IL

Various Highways throughout District 3
Infrastructure
Results

Route 317 (US 24) Beginning at the Intersection of US 45/24(L.M. 0.00) in Gilman and Ending at the Intersection of US 24 and IL 1 (L.M. 12.34)
Infrastructure
Post-Bid
IL

RR-21-4821 Pavement Repairs
Infrastructure
Results

Route 57 (I-57) Beginning at the Ford County Line and Ending Approximately 4.5 Miles North of US 24 (Gilman)
Infrastructure
Post-Bid
IL

Last Updated 02/02/2023 03:59 PM
Project Title

The Group IV - Various Streets Throughout the Village

Physical Address View project details and contacts
City, State (County) Onarga, IL 60955   (Iroquois County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $195,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Description of Work: The proposed work is officially known as Section 23-00000-00-GM The Group IV work includes BITUMINOUS MATERIAL, COVER AND SEAL COATS - 12,541 GALLON; SEAL COAT AGGREGATE - 447 TON; SPRAY PATCHING - 200 SQ YD on various streets throughout the Village of Onarga. A proposal guarantee by bank cashier's check, certified check or proposal bid bond in accordance with the "Standard Specifications for Road and Bridge Construction" prepared by the Illinois Department of Transportation adopted April 1, 2016, will be required. A surety bond for the full amount of the award will be required. The "prevailing rate of wages" as determined by the Illinois Department of Labor shall apply to this project. The right is reserved to reject any and all proposals and to waive technicalities.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents