Similar Projects
Construction and Renovation of the Springville Fire Station
Renovation - 4,800 SF
Bidding
Springville, UT 84663

New Construction of Fire Station 62
New Construction - 15,000 SF
Post-Bid
Less than $6,000,000 est. value
Spanish Fork, UT

South Davis Metro Fire Station 84 Facility and Parking Upgrade
Post-Bid
Bountiful, UT 84010

Moab Wildfire Station
New Construction - 5,000 SF
Results
$1,500,000 to $3,000,000 est. value
Moab, UT 84532

Remodel of Ogden City Fire Station 4
Renovation
Results
Ogden, UT 84401

Murray City Fire Station 18 Construction Services
Construction
Murray, UT

Construction Manager/General Contractor Services - Police and Fire Station 64
New Construction - 35,000 SF
Construction
Less than $11,200,000 est. value
South Jordan, UT

Fire Station 52 CM/GC Services
Post-Bid
$4,750,000 to $5,000,000 est. value
American Fork, UT 84003

Elmo Town - Fire Station Addition
Addition - 2,000 SF
Results
Less than $400,000 est. value
Price, UT 84521

DFCM Construction-Standard Low Bid-DHS/DJJS Dixie Area Detention Center Renovation-19426430
Renovation
Construction
$1,200,000 est. value
Hurricane, UT 84737

Station 115 Kitchen Remodel
Renovation
Post-Bid
Copperton, UT 84006

Fire District Office - Milford
Results
Less than $586,481 est. value
Milford, UT 84751

Station 113 Laundry and Bedroom Addition
Addition
Post-Bid
Less than $30,000 est. value
Snowbird, UT 84092

Station 252 Kitchen Remodel and Bedroom Improvements
Renovation
Results
Salt Lake City, UT 84005

South Rim Fire Station Building
New Construction
Post-Bid
Tooele, UT

Reported 05/06/2021 12:00 AM
Project Title

Fire Station Remodel

Physical Address View project details and contacts
City, State (County) Springville, UT 84663   (Utah County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of finishing the 2nd floor Springville Fire Station;including 6 new dormitory rooms, 3 new toilet room showers, a kitchen and day room.The 2ndfloor is currently in a rough finish state. Major construction information, materials and systems include: 1. Finishing the 2ndfloor from its core and shell state. 2. Upgrade of utility power including the electrical panels. 3. Renovation of existing lighting and power 4. Renovation of existing HVAC system

Details

Fire/Police Station, 4,800 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents