Similar Projects
101 West Main Street Demolition Project
Demolition
Bidding
Marshalltown, IA 50158

Spring Demolitions 2022
Demolition
Bidding
$15,000 est. value
Davenport, IA

LTC Building Demolition and Grading
Demolition, Infrastructure
Post-Bid
Grundy Center, IA

Demolition
Demolition
Post-Bid
Kellogg, IA 50135

Skywalk Bridge 7C-7D Removal
Demolition
Results
$335,000 est. value
Des Moines, IA 50309

Cedar Rapids Hydropower Facility Demolition
Demolition
Results
$2,670,000 est. value
Cedar Rapids, IA

Waste Water Treatment Plant Laboratory Building and Odor Control Project
Renovation, Demolition
Bidding
$6,195,000 est. value
Fort Dodge, IA 50501

Structures Demolition Phase I
Infrastructure
Post-Bid
Clinton, IA 52732

Demolition of 1518-1522 Douglas Street
Infrastructure
Results
$175,000 est. value
Sioux City, IA 51105

Demolition of Fire Damaged Structure at 545 Napier Street
Demolition
Post-Bid
Dubuque, IA 52001

Indoor Pool Demolition
Demolition
Results
$200,000 est. value
Urbandale, IA 50322

Old High School Demolition
Demolition
Post-Bid
Eldora, IA

Sloane Wallace Stadium Demolition WCSD
Demolition
Results
Waterloo, IA 50702

Bait Shop and Lift Station Demolition, Pleasant Creek SRA, Linn County, Iowa
Demolition
Post-Bid
$80,000 est. value
Robins, IA

Demolition of DICO Buildings at 200 Southwest 16th Street
Demolition
Results
Less than $923,000 est. value
Des Moines, IA 50309

Reported 05/03/2022 12:00 AM
Project Title

Demolition of a house and outbuildings (including volunteer trees)

Physical Address View project details and contacts
City, State (County) Alexander, IA 50420   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of a house and outbuildings (including volunteer trees) at 302 Harriman Street and basement(s) filled in. 1. Total Removal of foundation(s) and filled in. 2. Pushing the debris into the hole and filling in the top 2-3 feet with black dirt.

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents