Similar Projects
St. Lucie County Fire District Stations 10 & 15 Concrete & Drainage Rehabilitation
Bidding
Fort Pierce, FL 34953

Portofino Shores Lake Bank Restoration
Post-Bid
$484,650 to $530,510 est. value
Fort Pierce, FL

Ten Mile Creek Oxbow Restoration
Results
Fort Pierce, FL

Canal Maintenance
Results
Fort Pierce, FL 34945

Tilton Road Drainage Improvement Project
Results
Fort Pierce, FL 34945

Fort Pierce Inlet Artificial Reef Construction
Results
Fort Pierce, FL 34982

Summit Street at NSLRWCD Canal 8 Culvert Replacement
Results
$180,000 est. value
Fort Pierce, FL 34982

E-3 Canal Improvements - Phases 1 and 2 Construction Project
Results
Less than $5,200,000 est. value
Port Saint Lucie, FL 34984

McCarty Ranch Extension Water Quality Restoration Construction Project - Area 3
Results
Less than $2,000,000 est. value
Port Saint Lucie, FL 34984

Park and Ride Lots
Results
Less than $2,718,616 est. value
FL

Drainage Repairs and Improvements
Results
Less than $200,000 est. value

Emergency Dune Restoration and Miscellaneous Beach Services
Term Contract
Results
Fort Pierce, FL 34982

Emergency Debris Removal/Dike Repair
Results
Fort Pierce, FL 34982

Shore Protection Project, Beach Rennourishment 2021, Ft Pierce, St, Lucie County, Florida
Results
$5,000,000 to $10,000,000 est. value
Fort Pierce, FL GROUP118

Immokolee Road at FPFWCD Canal 5 Culvert Replacement
Results
$1,000,000 est. value
Fort Pierce, FL 34982

Last Updated 01/28/2021 09:56 AM
Project Title

Construction of the Sagamore Storm Water Treatment Areas - East and West

Physical Address View project details and contacts
City, State (County) Port Saint Lucie, FL 34983   (Saint Lucie County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,890,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To construct two (2) Stormwater Treatment Areas (STA’s) on two separate parcels of land owned by the City. The project will consist of excavating the existing land into wet detention ponds, along with installation of piping, control structures, sidewalk, sheet pile weir and utility adjustments. These proposed projects are in the general vicinity described below: East STA- North of NW Floresta Drive, south/west of NW Concord Dr and east of NW Bryson St (Parcel ID 3420-620-2311-000-0) West STA – North of NW Riverside Dr, south of NW Ferris Dr, in between NW Kingston St and NW Concord Dr. (Parcel Id’s 3420-620-0603--000-0 & 3420-620-0602-000-3)

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents