Similar Projects
Widen, Resurface and Bridge - SH 48
Infrastructure
Design
$19,620,000 CJ est. value
Durant, OK 74701

Widen, Resurface and Bridge - SH 48
Infrastructure
Design
$19,620,000 CJ est. value
Durant, OK 74701

Water System Improvements - Phase II Proposed Test Hole
Infrastructure
Bidding
$350,000 CJ est. value
Colbert, OK 74733

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Water System Improvements Phase I - Proposed Test Hole Smiser Tank Location
Infrastructure
Post-Bid
$400,000 CJ est. value
Calera, OK 74730

CWSRF Collection System Improvements
Infrastructure
Results
$683,595 CJ est. value
Caddo, OK 74729

Choctaw Street Sewer Main Extension
Infrastructure
Results
$49,787 CJ est. value
Caddo, OK 74729

Intersect Modif - SH 78
Infrastructure
Design
$2,064,503 CJ est. value
Durant, OK 74701

Water System Improvements - Phase I Proposed Test Holes in Smiser Tank Site and Blue Tank Site
Infrastructure
Post-Bid
$200,000 CJ est. value
Durant, OK 74701

Resurface (Asphalt) SH-78: From Main Street, Extend North in Durant
Infrastructure
Results
$12,482,684 CJ est. value
Durant, OK 74701

Grade, Drain and Surface - US 70
Infrastructure
Design
$2,724,999 CJ est. value
Bokchito, OK 74726

Cxt Gate House Installation for East Burns Run Public Use Area
Infrastructure, Renovation
Post-Bid
$250,000 CJ est. value
Cartwright, OK 74731

Construction of a New Emergency Operating Center
New Construction, Infrastructure
Results
$995,000 CJ est. value
Durant, OK 74701

Right of Way - US069
Infrastructure
Design
$1,000,000 CJ est. value
Calera, OK 74730

Choctaw Nation Durant Multi-Family Apartments
New Construction, Infrastructure - 200,844 SF
Post-Bid
$25,000,000 CJ est. value
Durant, OK 74701

Last Updated 08/12/2023 08:47 AM
Project Title

C & D Landfill Liner Construction

Physical Address View project details and contacts
City, State (County) Durant, OK 74701   (Bryan County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $134,879 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This scope of work outlines the activities, responsibilities, and deliverables associated with the construction of a 3-foot-thick clay soil liner with a hydraulic conductivity no greater than 1.0 x 10-5 cm/sec. The objective is to construct a low permeability barrier for proper waste material containment within the landfill. As a part of the bid on this project, the successful bidder will be required to meet all requirements of the Underground Facilities Damage Prevention Act when engaged in work within the public right-of-way in the same manner as in private right-of-way. The Owner may waive any informalities or minor defects or reject any and all bids. Any bid may be withdrawn prior to the above-scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. No bidder may withdraw a bid within 60 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the Owner and the bidders.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents