Similar Projects
Category 6A Structured Cabling System
Post-Bid
Florence, WI 54121

Highway A Fiber Optic Relocation
Post-Bid
WI

Middle-Mile Fiber Optic Network/Wide Area Network
Results
Medford, WI 54451

County Wide Communications System
Results
Eau Claire, WI

Card Access Service And Maintenance Work At Facilities Management Courthouse Complex & County Grounds
Post-Bid
Milwaukee, WI 53233

Campus Fiber Optic Backbone Replacement - General
Results
Less than $650,000 est. value
Superior, WI 54880

Central Station Alarm Monitoring (CSAM)
Post-Bid

Information Technology Infrastructure Renovation
Results
Less than $3,800,000 est. value
Milwaukee, WI

Parks Entrance Automated License Plate Reader Camera System
Post-Bid
Brookfield, WI 53045

Administration Unit Controls Upgrade
Results
Less than $155,000 est. value
Irma, WI 54442

Siren Maintenance and Repair Services
Term Contract
Post-Bid
WI

PLC 5 Upgrade in the Dewatering and Drying Facility
Results
Milwaukee, WI 53207

On Premise Voice System
Alteration
Post-Bid
Appleton, WI 54911

Wi-Fi System Updates Phase 2 of 2 (6 Buildings)
Results
Holmen, WI 54636

Tower Site Construction
Infrastructure
Post-Bid
WI

Last Updated 06/21/2022 04:51 AM
Project Title

Building Automation System Upgrade

Physical Address View project details and contacts
City, State (County) Sturtevant, WI 53177   (Racine County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $950,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is being let using a new single trade bidding and contracting process. When 85% or more of the construction cost of a project could be completed by a Single Trade Contractor (mechanical, electrical, plumbing, or fire protection), the Department may bid and contract all work of that construction project directly to a Single Trade Contractor. The State will enter into a single contract with the lowest, qualified, responsible, certified single trade MEP contractor. Single trade MEP contractors may bid on single trade projects up to their current division of work certification level for that trade. All Work for this project will be awarded to a single trade Mechanical contractor. Bidders shall submit a Single Base Bid for all Work. In general the work consists of replacement of aging Johnson Controls Generation 1 and 2 DDC (Direct Digital Control) controllers with new DDC controllers for major HVAC equipment (air handlers, boilers, etc). Replacement parts for these DDC controllers are obsolete. Also included in the scope is replacing pneumatic damper actuators and pneumatically actuated control valves for the air handlers. Conduit, wiring and panel and field control devices will be reused were possible. Some minor pneumatic controls will remain because of cost and accessibility. Pneumatically actuated smoke dampers will remain and be controlled from the new DDC system. New temperature control air compressors will be provided for several buildings for actuation of the existing smoke dampers. Existing air compressors will be removed as they currently have contaminated existing controls and air tubing with oil. A new Building Automation System front end computer workstation will be furnished by the Agency for access to the new control system. Buildings A, S, V, W, AA, BB and CC are not included in this scope of work as DDC controllers in those buildings are not obsolete or have local pneumatic/electric controls. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents