Similar Projects
Construction of Concrete Sidewalk and Ramp
Post-Bid
Dickinson, TX

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Construct Curb Ramps and Signal Improvements
Results
Less than $2,950,761 est. value
TX

Stewart Beach Parking Lot Grading Project
Results
Galveston, TX 77550

Texas City Park & Ride - Administration Facility
New Construction - 13,100 SF
Construction
Texas City, TX 77591

Cruise Terminal 1 Walkway Circulation Improvements
Infrastructure
Post-Bid
Galveston, TX

Brown Drive Construction and Amburn Road Sidewalk Project
Results
$750,000 est. value
Texas City, TX 77591

TxCDBG Downtown Revitalization Sidewalk Project
Infrastructure
Post-Bid
TX

Hike and Bike Trails Wayfinding Phase One
Results
League City, TX

Pier 10 Redevelopment / Parking Facility
Infrastructure
Post-Bid
Galveston, TX

Hughes Road Elementary School Parking Lot Replacement
Results
Less than $1,500,000 est. value
San Leon, TX 77539

SH 87 - Ferry Operation Projects
Alteration
Post-Bid
$6,783,196 est. value
Port Bolivar, TX 77650

Hometown Heroes Park 5K Loop Trail and East Side Dog Park
Results
League City, TX 77573

FM-518 Illumination Installation
Infrastructure
Post-Bid
$2,500,000 est. value
Friendswood, TX

Thomas Mackey Water Treatment Plant New Parking Lot and Additional Drainage
Infrastructure
Results
$250,000 est. value
Texas City, TX 77591

Reported 06/14/2022 03:06 PM
Project Title

Tannos Medical Building

Physical Address View project details and contacts
City, State (County) Friendswood, TX 77546   (Galveston County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Sidewalks/Parking Lot
Contracting Method Bids by Invitation.
Project Status Construction Commenced May 2022
Bids Due View project details and contacts
Estimated Value $28,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New four-story glass and masonry shell office building and parking lot. On May 26, 2022, the project received site plan approval from the Friendswood Planning and Zoning Commission. As of June 13, 2022, site work is under way. An architect has been selected. Information regarding the selection of a general contractor has not been disclosed. No timeline for construction has been determined.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Office, 106,908 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents